Latest News

Weekly Update: October 17, 2018

October 17, 2018

Check out October 17th’s Kingfish Bay Construction Updates. Beautiful creations abound! B-17 Angelfish Carpet has been installed in the second floor B-17 Angelfish Countertops have been installed in the kitchen B-17 Angelfish Backsplash has been installed in the kitchen B-17 Angelfish Lighting fixtures have been installed B-17 Angelfish Shelving has been installed B-17 Angelfish Appliances […]

Read More

Weekly Update: October 2, 2018

October 2, 2018

Check out October 2nd’s Kingfish Bay Construction Updates. Happy Autumn! Starting to paint the interior of Angelfish B-17 Bathroom accessories/hardware are installed in Angelfish B017 Insulation has been installed in Longfin CV-6 Delivering sheet rock today and preparing to install in Longfin CV-6              

Read More

Weekly Update: September 26, 2018

September 27, 2018

Check out September 26th’s Kingfish Bay Construction Updates. Onward and upward! Work on Phase 1B Work on Phase 2A Elevator Installation at Sunset Beach Clubhouse  

Read More

Weekly Update: September 20, 2018

September 20, 2018

Check out September 20th’s Kingfish Bay Construction Updates. Back to it! Flooring installed in B-17 Angelfish Tile installed in B-17 Angelfish Sidewalk framed for front of B-17 Angelfish Windows are set in CV-6 Longfin Pouring concrete for curbs and gutters in Phase 2              

Read More

Kingfish Bay comes out unscathed

September 20, 2018

Thank you all for expressing your concerns about the effects of Hurricane Florence on Kingfish Bay. We did take into consideration the risk of a hurricane when planning the development, homes, and Sunset Beach clubhouse and felt that the properties were secure. That said, the community did come out of the storm virtually unscathed. Our […]

Read More

Weekly Update: September 6, 2018

September 6, 2018

Check out September 6th’s Kingfish Bay Construction Updates. Welcome home! House is completely wrapped on cv-6 longfin Plumbing trim out is complete for cv-6 longfin Front door is painted for B-17 Angelfish Master WIC has shelving and compartments installed for B-17 Angelfish        

Read More

Weekly Update: September 4, 2018

September 5, 2018

Check out September 4th’s Kingfish Bay Construction Updates. Kingfish Bay … a place to call home. Second story balcony/deck for B-17 Angelfish House wrap for CV-6 Longfin Laying out roads for phase 2A              

Read More

Weekly Update: August 30, 2018

August 30, 2018

Check out August 30th’s Kingfish Bay Construction Updates. Nice work! CV-6 is under roof Cabinets have been installed in the second floor bar area of B-17 Angelfish      

Read More

Weekly Update: August 28, 2018

August 29, 2018

Check out August 28th’s Kingfish Bay Construction Updates. Building the Longfin and working on Phase 2! Roof trusses have been set and continue to sheath and frame CV-6 Longfin Cabinets have been installed in B-17 Angelfish Grading Phase 2                

Read More

Weekly Update: August 23, 2018

August 23, 2018

Check out August 23rd’s Kingfish Bay Construction Updates. Moving on to the next phases! Sheathing CV-6 Longfin Hauling loads of dirt for grading Phase 2 Transporting material for the next phases             

Read More

Weekly Update: August 21, 2018

August 22, 2018

Check out August 21st’s Kingfish Bay Construction Updates. Lots going on … and going in … at Kingfish Bay! Installed shutters on B-17 Angelfish Starting to paint the interior of B-17 Angelfish Finished the landscaping for C-7 Albacore II Added river rock to landscape of B-1 Seahorse Starting to frame cv-6 Longfin Progress on Phase […]

Read More

Weekly Update: August 14, 2018

August 14, 2018

Check out August 14th’s Kingfish Bay Construction Updates. Kingfish Bay has it all … even its own Trolley! Drywall is ready for paint B-17 Angelfish Handrail has been installed B-17 angelfish Doors are installed B-17 Angelfish Shower seat has been constructed in master bathroom of B-17 Angelfish Installing gutters on B-1 Seahorse, C-7 Albacore II, […]

Read More

Weekly Update: August 9, 2018

August 9, 2018

Check out August 9th’s Kingfish Bay Construction Updates. Caribbean pastels, lush tropical landscaping, Bahama shutters … and surrounded by the beauty of the Carolina coast. Truly breathtaking! Painted the exterior of B-17 Angelfish Installed carpet in the guest bedroom of CV-7 Tarpon Landscaping is complete in the front yards of CV-7 and CV-9 Tarpons Hot […]

Read More

Weekly Update: August 2, 2018

August 2, 2018

Check out August 2nd’s Kingfish Bay Construction Updates. Nice! Appliances have arrived for B-14 Angelfish Working on trim work in B-17 Angelfish Installed new interior lighting in CV-4 Marlin Installed ceramic and deco tile in C-9 Bonita Starting to install fencing around CV-7 Tarpon Planted shrubbery for CV-7 Tarpon Finished installing CoreTec Flooring in CV-7 […]

Read More

Kingfish Bay CONSTRUCTION UPDATES Tuesday 07/31/18

July 31, 2018

Check out July 31st’s Kingfish Bay Construction Updates. A lot has happened! Lookin’ good! B-14 Angelfish Carpet has been installed Plumbing fixtures have been installed Ceramic tile in the shower has been installed Countertops, cabinets and backsplash have been installed   B-17 Angelfish Started to paint the exterior Installed sheetrock   CV-3 Marlin Completed the […]

Read More

Weekly Update: July 17, 2018

July 17, 2018

Check out July 17th’s Kingfish Bay Construction Updates. Have we started yours yet? Installing the siding on B-17 Angelfish Installing carpet on the stairs and second floor of CV-4 Marlin Installing tile in CV-7 Tarpon Installing tile in CV-9 Tarpon Installed cabinets and countertops on C-7 Albacore II Plastered the pool for C-5 Cobia   […]

Read More

Weekly Update: July 10, 2018

July 10, 2018

Check out July 10th’s Kingfish Bay Construction Updates. More Caribbean style homes going up! Homes built to stand up to the elements … while looking incredible! Starting to install siding on B-17 Angelfish Installed the shingles and metal ribbed roofing accents for B-17 Angelfish Preparing to install concrete pavers and spa for the enhanced landscaping […]

Read More

Weekly Update: July 3, 2018

July 3, 2018

Check out July 3rd’s Kingfish Bay Construction Updates. The inside is just as beautiful as what’s outside … beauty throughout! Countertops installed in Angelfish B-14 Flooring installed in B-14 Angelfish Wet Bar and cabinets installed for Angelfish B-14 Installed the flooring in CV-4 Marlin Starting to install kitchen cabinets in C-7 Albacore II Installing shiplap […]

Read More

Kingfish Bay’s SPORTS COURT and PICNIC AREA

July 3, 2018

Kingfish Bay’s SPORTS COURT and PICNIC AREA are wonderful additions to the community. The perfect spot to gather with family and friends for a “Picnic in the Park” and a good old game of Corn Hole. Enjoy fun and games in the Great Outdoors at Kingfish Bay!      

Read More

Kingfish Bay’s NATURE PAVILION is stunning!

July 3, 2018

What a wonderful space for lounging and socializing in a beautiful and natural setting overlooking the scenic woodlands & wetlands. A great meeting spot for residents in the trellised areas with shade and cover or by the fire pits for warmth and evening ambiance. What a special community!

Read More

Weekly Update: June 28, 2018

June 28, 2018

Check out June 28th’s Kingfish Bay Construction Updates. Beautiful progress! Sod has been added to B-11 Angelfish Backsplash in the kitchen is installed for CV-4 Marlin Cabinets and lighting are installed for C-9 Bonita Shutters are painted and installed, door is painted for C-4 Albacore II The exterior is completely painted for C-7 Albacore II […]

Read More

Weekly Update: June 26, 2018

June 27, 2018

Check out June 26th’s Kingfish Bay Construction Updates. Come enjoy the “kick back” Caribbean vibe of Kingfish Bay. Completely installed Cabinets in B-14 Angelfish Framed shower seat in B-14 Angelfish Installed lighting fixtures in B-11 Angelfish Starting to layout plants for the landscape around B-11 Angelfish Screened in the top porch of B-11 Angelfish Painted […]

Read More

Weekly Update: June 21, 2018

June 21, 2018

Check out June 21st’s Kingfish Bay Construction Updates. We’re building you a beautiful home … in a breathtaking community! Installing cabinets in B-14 Angelfish Installed stone around the fireplace in B-11 Angelfish House wrap and roof felt is on B-17 Angelfish Starting to install the tile in the shower of CV-4 Marlin Put sod down […]

Read More

RIBBON CUTTING & Official GRAND OPENING Album

June 20, 2018

The Brunswick County Chamber of Commerce ceremonialRIBBON CUTTING & Official GRAND OPENINGof the CLUBHOUSE, BATH… Posted by Kingfish Bay Development on Wednesday, June 20, 2018

Read More

Weekly Update: June 19, 2018

June 19, 2018

Check out June 19th’s Kingfish Bay Construction Updates. Ready to move in? Fireplace is in B-11 Angelfish and ready to have the stone installed Installed roof trusses on B-17 Angelfish Installed countertops in the kitchen and bathroom in C-3 Bonita Installed shower door in C-3 Bonita In the process of staining the steps in C-3 […]

Read More

Weekly Update: June 14, 2018

June 14, 2018

Check out June 14th’s Kingfish Bay Construction Updates. We’re on a roll! Plumbing fixtures set in B-11 Angelfish Interior painted in B-11 Angelfish Framing and sheathing B-17 Angelfish Countertops installed in CV-4 Marlin Cabinets installed in CV-7 Tarpon Appliances and countertops are in C-4 Albacore II Adding the landscape to the front of C-4 Albacore […]

Read More

Weekly Update: June 12, 2018

June 14, 2018

Check out June 12th’s Kingfish Bay Construction Updates. Lookin’ good! Flooring has been installed in B-13 Angelfish Plumbing fixtures are set in B-13 Angelfish Appliances and countertops are in B-13 Angelfish Mantel has been built and installed in B-11 Angelfish for the fireplace Flooring is installed in B-11 Angelfish Countertops are installed in B-11 Angelfish […]

Read More

Weekly Update: June 7, 2018

June 14, 2018

Check out June 7th’s Kingfish Bay Construction Updates! Some final touches! Landscaping and sod is complete for C-3 Bonita CV-4 Marlin landscaping is complete Building a screened in porch for C-4 Albacore Siding almost completely installed in C-7 Albacore II Furniture has been added to the nature pavilion Putting green is complete Installing railroad ties […]

Read More

Weekly Update: June 5, 2018

June 5, 2018

Check out June 5th’s Kingfish Bay Construction Updates! The beauty of nature surrounds! Placed sod around Angelfish B-12, B-13, and B-14 Installing shutters or Angelfish B-14, B-13, and B-11 Painted exterior of Angelfish B-11 Prepping for tile installation in bathroom of Angelfish B-11 Applied first coat of interior paint for Angelfish B-11 Installed cabinets in […]

Read More

Weekly Update: May 31, 2018

May 31, 2018

Check out May 31st’s Kingfish Bay Construction Updates! Are you watching the beautiful progress? Exciting times! Framing B-17 Angelfish Installed cabinets and tile in B-11 Angelfish Installed flooring in C-3 Bonita Completed installation of the pavers in the courtyard of CV-1 Tarpon Installed cabinets in C-4 Albacore II Framed the fireplace in C-7 Albacore II […]

Read More

Weekly Update: May 29, 2018

May 29, 2018

Check out May 29th’s Kingfish Bay Construction Updates! Breathtaking! Tile is installed in the bathrooms in B-13 Angelfish Framing the Nature Pavilion Insulated the stairs and starting trim work in C-4 Albacore II              

Read More

Weekly Update: May 24, 2018

May 24, 2018

Check out May 24th’s Kingfish Bay Construction Updates! Come “Live the Dream!” Starting to install trim in B-11 Angelfish Beginning to install tile in the bathrooms of B-11 Angelfish Finishing the landscaping around B-14, B-13, and B-12 Angelfish Framing and sheathing B-17 Angelfish Added landscaping to the backyard of the Bonita C-3 Fireplace is set […]

Read More

Weekly Update: May 22, 2018

May 22, 2018

Check out May 22nd’s Kingfish Bay Construction Updates! Getting your Dream Home all ready for you! Landscaping has been added around B-12 Angelfish Starting to frame B-17 Angelfish Poured concrete for the walkways between the Angelfish Bungalows Tiled bathrooms in C-3 Bonita Installed cabinets in C-3 Bonita Cabinets and countertops are installed in CV-1 Tarpon […]

Read More

Sunset Beach Clubhouse Update: May 17, 2018

May 17, 2018

Kingfish Bay residents will have their own private sandbox! This beautifully designed, multi-level private clubhouse is located only 5.6 miles (or a 10-minute trolley ride) from Kingfish Bay at Sunset Beach. This beachfront property allows residents to experience the inviting waters and white sand shoreline of the Atlantic Ocean, along with the convenience of bath houses […]

Read More

Weekly Update: May 17, 2018

May 17, 2018

Check out May 17th’s Kingfish Bay Construction Updates! Wonderful things are happening! Tile is installed in the bathrooms of B-12 Angelfish Backsplash is installed in the kitchen of B-12 Angelfish Mudded the sheetrock in B-11 Angelfish Sidewalk framed and prepped for concrete between the Angelfish Bungalows Flooring completely installed in C-6 Albacore Driveway is framed […]

Read More

Weekly Update: May 15, 2018

May 15, 2018

Check out May 15th’s Kingfish Bay Construction Updates! Lookin’ good … naturally! • Countertops are installed in B-12 Angelfish • Drywall has been installed in B-11 Angelfish • Painted the side shutters to match the front door colors for Angelfish’s B-14, B-13, and B-12 • Installing tile in CV-1 Tarpon • Landscaping and fencing have […]

Read More

Weekly Update: May 10, 2018

May 10, 2018

Check out May 10th’s Kingfish Bay Construction Updates! The colorful Caribbean feel of Kingfish Bay. Front doors painted on B-14, B-13, B-12 (All Angelfish) Interior and exterior lighting installed in B-12 Angelfish Beginning to tile B-12 bathrooms Installing fence around CV-1 Tarpon Installed flooring in CV-3 Marlin Installed pavers around the pool on C-11 Cobia […]

Read More

Weekly Update: May 8, 2018

May 8, 2018

Check out May 8th’s Kingfish Bay Construction Updates! The Carolina’s newest Coastal Community … in America’s Best Little Small Town … Calabash, NC Siding, roofing, insulation, rough plumbing, rough mechanical all installed and complete for B-11 Angelfish Cabinets installed, master shower prepped and ready for tile in B-12 Angelfish Sidewalks poured for B-11, B-12, B-13 […]

Read More

Weekly Update: May 3, 2018

May 3, 2018

Check out May 3rd’s Kingfish Bay Construction Updates! The breathtaking views and natural setting is just the beginning of the journey! • Fencing has been completely installed for CV-5 Tarpon • Fencing around the courtyard has been installed for CV-4 Marlin • Exterior painting of C-9 Bonita is almost finished • Framing for the driveway […]

Read More

Weekly Update: May 1, 2018

May 1, 2018

Check out May 1st’s Kingfish Bay Construction Updates! Beautiful “works of art” in progress! Started to grade around Angelfish Bungalows Rough electric in B-11 Angelfish Almost complete with the fence around the pool for CV-5 Tarpon Adding river rock and landscaping for CV-5 Tarpon and pool is filled Putting sod down on the side of […]

Read More

Weekly Update: April 26, 2018

April 26, 2018

Check out April 26th’s Kingfish Bay Construction Updates! Come Live Relaxed … in this private slice of paradise! Rough mechanical, electrical, plumbing is installed for B-11 Angelfish Final electric is complete and power is on B-13 Angelfish First coat of interior paint is complete for B-14 Angelfish Sod and landscaping has been added to the […]

Read More

Weekly Update: April 24, 2018

April 24, 2018

Check out April 24th’s Kingfish Bay Construction Updates! Beauty, from the inside out! In the process of installing siding on Angelfish B-11. Roof felt is on B-11 Angelfish Under slab plumbing for B-17 Angelfish Blinds are installed in CV-5 Tarpon Appliances are in CV-5 Tarpon CV-5 Tarpon pool has pavers and they are working on […]

Read More

Weekly Update: April 19, 2018

April 19, 2018

Check out April 19th’s Kingfish Bay Construction Updates! It’s a Masterpiece in the making! Installing the siding on B-11 Angelfish B-17 Angelfish foundation is framed Adding plants to the CV-5 Tarpon landscape Framed driveway for CV-4 Marlin and ready for concrete to be poured B-1 Seahorse foundation is framed and under slab plumbing is complete […]

Read More

Weekly Update: April 17, 2018

April 17, 2018

Check out April 17th’s Kingfish Bay Construction Updates! A Caribbean Resort Village in Calabash, North Carolina … BEAUTIFUL! House wrap and windows installed for B-11 Angelfish Plumbing fixtures installed in CV-5 Tarpon Gutters are being installed on CV-7 Tarpon Front door painted on CV-1 Tarpon First coat of interior paint C-9 Bonita Pavers around the […]

Read More

Weekly Update: April 12, 2018

April 12, 2018

Check out April 12th’s Kingfish Bay Construction Updates! Homes that  shine from the inside out … and the outside in! Backsplash CV-5 Tarpon Kitchen Barn Doors in CV-5 Tarpon Cabinets and Countertops installed in Guest Suite of CV-5 Tarpon Plumbing for the pool in CV-5 Tarpon Added more tile to the CV-5 Tarpon pool Painted […]

Read More

Weekly Update: April 10, 2018

April 10, 2018

Check out April 10th’s Kingfish Bay Construction Updates! Homes that  enhance a natural living experience! Starting to frame second floor covered Loggia on Angelfish B-11 Sanding drywall to prepare for interior paint on Angelfish B-12 and Bonita C-9 Flooring has been installed for CV-5 Tarpon Countertops have been installed in Kitchen and Bathrooms for CV-5 […]

Read More

Weekly Update: April 5, 2018

April 5, 2018

Check out April 5th’s Kingfish Bay Construction Updates! We’re building DREAM HOMES! Added roof trusses to B-11 Angelfish Painting the interior of CV-4 Marlin Adding and painting trim the exterior of CV-9 Tarpon Flooring is completely installed in C-10 Albacore Exterior of C-6 Albacore has been painted Shingles have been installed on C-4 Albacore II […]

Read More

Weekly Update: April 3, 2018

April 3, 2018

Check out April 3rd’s Kingfish Bay Construction Updates! We’re SPRINGING forward! Framing second floor and sheathing B-11 Angelfish Mudded Angelfish B-12 Final Electric, Cabinets installed, and master bath shower tile & door installed for CV-5 Tarpon Cement has been poured for pool CV-5 Tarpon Finished exterior painting for CV-7 and CV-9 Tarpon Completing trim work […]

Read More

Weekly Update: March 29, 2018

March 29, 2018

Check out March 29th’s Kingfish Bay Construction Updates! Get ready to Live Relaxed. Starting to frame B-11 Angelfish Installing drywall in B-12 Angelfish Painting the exterior of CV-7 Tarpon Painting exterior of CV-9 Tarpon The pool is completely framed for CV-5 Tarpon First coat of interior paint is complete for CV-1 Tarpon Appliances are installed […]

Read More

Weekly Update: March 27, 2018

March 27, 2018

Check out March 27th’s Kingfish Bay Construction Updates! Making great progress! Painting interior accent wall color in CV-4 Marlin Digging and framing for the pool for CV-5 Tarpon Building a screened-in porch for C-10 Albacore C-7 Albacore II is ready for slab to be poured Windows are installed and house wrap is on C-4 Albacore […]

Read More

Sunset Beach Clubhouse Update: March 22, 2018

March 22, 2018

Thursday, March 22, 2018 PRIVATE SUNSET BEACH CLUBHOUSE Update from #kingfishbay • Update … Lookin’ good!               

Read More

Weekly Update: March 22, 2018

March 22, 2018

Check out March 22nd’s Kingfish Bay Construction Updates! Some “Finishing Up” and beautiful “New Beginnings” at Kingfish Bay! Pool is formed for C-3 Bonita Drywall has been installed in C-3 Bonita C-4 Albacore II is under roof Drywall has been installed in C-6 Albacore Tile is installed in the bathrooms of C-10 Albacore Landscaping around […]

Read More

Weekly Update: March 20, 2018 – Happy Spring Equinox!

March 20, 2018

Check out March 20th’s Kingfish Bay Construction Updates! Homes are springing up everywhere at Kingfish Bay! Happy Spring Equinox! Insulation installed in Angelfish B-12 C-8 Albacore has been sold and closed. Second floor roof trusses set on C-4 Albacore II Sheathing is being installed on C-4 Albacore II C-7 Albacore II foundation is framed waiting […]

Read More

Weekly Update: March 15, 2018

March 15, 2018

Check out March 15th’s Kingfish Bay Construction Updates! We’re sprouting and blooming! Landscaping added around the Clubhouse and model homes Both Marlin Exteriors (CV-10 & CV-3) have been painted Concrete has been poured for entrance/walkways for CV-4 Marlin, CV-5 Tarpon, and B-15 Angelfish Setting roof trusses for C-4 C-2 Albacore is complete and has been sold/closed […]

Read More

Sunset Beach Clubhouse Update: March 15, 2018

March 15, 2018

Thursday, March 15, 2018 PRIVATE SUNSET BEACH CLUBHOUSE Update from #kingfishbay • Update … WOW! NICE!              

Read More

Weekly Update: March 14, 2018

March 14, 2018

Check out March 14th’s Kingfish Bay Construction Updates! Beautiful things are “Springing” up all over Kingfish Bay! • Sidewalk poured in front of the Angelfish Bungalows • Walkway/Entrance framed and ready for concrete at the Angelfish B-15 • Slab has been poured on Angelfish B-11 • Exterior of CV-4 Marlin is painted. The front entrance/walkway […]

Read More

Kingfish Bay Home Exteriors PART VI

March 8, 2018

Kingfish Bay offers various Courtyard and Lagoon Style Pool Designs, as well as Hardscapes, that beautifully accentuate and compliment the stunning natural beauty that surrounds.  

Read More

Kingfish Bay Home Exteriors PART V

March 7, 2018

Palms symbolize the tropics and vacations, so they appropriately bring that tropical, resort-style look and feel to the “Live Relaxed” vibe of Kingfish Bay.  

Read More

Kingfish Bay Home Exteriors PART IV

March 6, 2018

True to Caribbean style, the use of both Louvered and Bahama Shutters is an elegant way to block intense UV rays … and add a unique and beautiful accent to Kingfish Bay homes.  

Read More

Kingfish Bay Home Exteriors PART III

February 28, 2018

The Insulated Fiberglass Front Entrance Door and Insulated Vinyl-clad Windows used on Kingfish Bay homes are low maintenance and energy efficient.      

Read More

The EXCITEMENT is BUILDING!

February 27, 2018

Progress on the Kingfish Bay Sunset Beach Oceanfront Clubhouse! THE EXCITEMENT IS BUILDING! *snicker*                                                                                                        […]

Read More

Weekly Update: February 15, 2018

February 20, 2018

Check out February 15th’s Kingfish Bay Construction Updates! This Gated Waterfront Community is sure shaping up! Accent tabby finish is complete on the Marlins CV-4, CV-3, and CV-10 Painting of the interior for CV-3 Marlin is complete Shutters installed on CV-7 Tarpon and CV-9 Tarpon Gutters installed on CV-5 Tarpon Sheetrock is being installed on […]

Read More

Progress on the Kingfish Bay Sunset Beach Oceanfront Clubhouse!

February 15, 2018

Framing has begun!                                              

Read More

Weekly Update: February 13, 2018

February 13, 2018

Check out February 13th’s Kingfish Bay Construction Updates! Going at it from all angles to create a “Live Relaxed” Community for you! Sheetrock installed CV-4 Marlin Sheetrock is being delivered for CV-10 Marlin Painting the interior and fiber cement board has been applied to the front exterior accent columns on CV-3 Marlin Insulation is going in […]

Read More

Kingfish Bay Home Exteriors PART II

February 7, 2018

The Dimensional Architectural Roofing Shingles used on Kingfish Bay homes create an impressive and dramatic appearance … while providing superior weather protection!

Read More

Weekly Update: February 6, 2018

February 6, 2018

Check out February 6th’s Kingfish Bay Construction Updates! Beautiful things are happening at “The Carolina’s Newest Coastal Community.” House wrap is on and windows are installed B-12 Angelfish Exterior painting and trim is complete on CV-5 Tarpon Flooring in the great room and kitchen has been installed C-11 Cobia Plumbing fixtures in the kitchen of C-11 […]

Read More

Weekly Update: February 1, 2018

February 1, 2018

Check out February 1st’s Kingfish Bay Construction Updates! Overlooking the Calabash River, this Gated Waterfront Community is A SIGHT TO BEHOLD! B-12 Angelfish is under roof Insulating CV-4 Marlin and CV-9 Tarpon Completing trim work and exterior painting on CV-5 Tarpon Installing HVAC system in CV-1 Tarpon Master bathroom and closet is tiled in C-11 […]

Read More

Kingfish Bay Home Exteriors PART I

January 31, 2018

Kingfish Bay homes are built to stand up to the elements … while looking incredible!

Read More

Weekly Update: January 30, 2018

January 30, 2018

Check out January 30th’s Kingfish Bay Construction Updates! Carolina’s Newest Coastal Community is shaping up nicely! Roof trusses are set for Angelfish B-12 More exterior paint has been added to CV-5 Tarpon Shower has been tiled in CV-5 Tarpon Graded for the road behind the courtyard villas Pouring concrete for the curbs behind the courtyard […]

Read More

Weekly Update: January 25, 2018

January 30, 2018

Check out January 25th’s Kingfish Bay Construction Updates! Things are rapidly progressing in “The Carolina’s Newest Coastal Community.” 1. Exterior lighting has been added to Albacore’s C-2 and C-8 2. Starting construction on the pool for C-2 Albacore 3. Framing & Sheathing the 2nd Story of Angelfish B-12 4. Painting is still in progress for […]

Read More

Weekly Update: January 23, 2018

January 30, 2018

Check out January 23rd’s Kingfish Bay Construction Updates! The Carolina’s Newest Coastal Community – in America’s BEST Little Small Town, Calabash, NC. 1. Shingles are installed on C-6 Albacore 2. Framing and sheathing B-12 Angelfish 3. Starting to paint exterior of CV-5 Tarpon 4. Siding, Windows and doors are installed on CV-10 Marlin 5. Poured […]

Read More

Weekly Update: January 17, 2018

January 17, 2018

Check out today’s Kingfish Bay Construction Updates! Welcome to America’s Best Little Small Town, Calabash, North Carolina. 1. Windows are installed on C-6 Albacore 2. Electrical finish work on C-2 Albacore and C-11 Cobia 3. Underground power for CV-1 Tarpon and CV-5 Tarpon 4. Tile is being installed in CV-5 Tarpon 5. Deck and stairs […]

Read More

Weekly Update: January 11, 2018

January 11, 2018

Check out today’s Kingfish Bay Construction Updates! The Carolina’s Newest Coastal Community – LIVE RELAXED. 1. Painting exterior of C-8 Albacore 2. First coat of paint has been applied to the interior of C-10 Albacore 3. Siding is almost completely installed on Angelfish B-13 4. Starting to paint the first coat on the interior of […]

Read More

Weekly Update: December 30, 2017

December 30, 2017

We are excited to announce that the sidewalks have been poured around the Clubhouse and in front of the Bungalow!

Read More

Weekly Update: December 20, 2017

December 20, 2017

Santa’s Elves are hard at work at Kingfish Bay! How’s it looking? Give us a call today to schedule a tour!

Read More

Myrtle Beach & Beaufort Named to Coastal Living’s “Best Beach Towns for Christmas”!

December 11, 2017

Exciting news for everyone that loves Christmas! This month Coastal Living Magazine selected Myrtle Beach, SC and Beaufort, NC as two of it’s “TOP 10 Best Beach Towns for Christmas”! Ho! Ho! HO! Beaufort, North Carolina Being this far south means that you can still get out on the water in kayaks without your Nanook […]

Read More
marlin exterior

Bath House Updates and More!

December 1, 2017

The centerpiece of Relaxed Living at Kingfish Bay can be found in the luxurious, on-site Community Center, which offers residents a wide variety of social and leisure activities, amenities and services that all add to an exceptional quality of life.

Read More

Weekly Update: October 26, 2017

October 26, 2017

Nothing but blue skies and building supplies!

Read More

Weekly Update: October 20, 2017

October 20, 2017

Another gorgeous day at Kingfish Bay! Check out what’s happening around our development ?  

Read More

Weekly Update: October 15, 2017

October 15, 2017

It’s Thursday….which means Friday is right around the corner! Take a look at what we accomplished this week. ?

Read More

Weekly Update: October 13, 2017

October 13, 2017

Tuesday Newsday! There’s so much going on here at Kingfish Bay!?  

Read More

Weekly Update: October 7, 2017

October 7, 2017

Happy FriYAY! ! There’s been a lot of exciting progress happening around our development. We are going vertical on 4 new houses, 4 other houses are under roof and in various stages, infrastructure is underway around the Bungalow area, and the community pool had concrete poured yesterday!

Read More

Weekly Updates: September 21, 2017

September 17, 2017

– Foundation framed for C-3 and CV-9 – House wrapped on C-11 – Working on the second floor framing for CV-3 – New palm trees in front of the Angelfish model – Starting to paint the exterior of the Bath House  

Read More

Weekly Update: September 14, 2017

September 14, 2017

Happy almost Friday! Weekly updates are below: 1. Run electric to the front entrance landscaping and decorative walls for lighting 2. The ceiling is going up in the Bath House 3. Cobia C-11 is under roof 4. Framers are working on the Marlin CV-3 5. Plumbers are starting the under slab plumbing on CV-5 6. […]

Read More

Weekly Updates: September 12, 2017

September 12, 2017

Good afternoon everyone! Please see below for our weekly updates. ? 1) Insulation has been installed in the Bath House 2) Siding is complete on the Bath House 3) Doors have been put on the Bath House 4) Some of the furniture has been delivered and is being staged in the Clubhouse 5) Paint touch-ups […]

Read More

Weekly Update: September 7, 2017

September 7, 2017

Good afternoon everyone! Here are your updates for today: – Final Plumbing is complete for the Clubhouse – Some of the exercise equipment has been delivered for the fitness room in the Clubhouse – Grading has been completed to start the foundation framing on Lot CV-5 – Framers are still working on C-11 – Rough-in […]

Read More

Weekly Updates: September 1, 2017

September 1, 2017

It’s FriYAY! What are your plans this Labor Day Weekend? Comment below and let us know! Updates today at KFB: 1. Lot CV-3 is ready to have concrete slab poured tomorrow morning 2. Foundation is being framed for Lot C-2 3. Leveling of the dirt getting ready to dig footers on Lot C-10 4. New […]

Read More

Weekly Updates: August 30, 2017

August 30, 2017

Good afternoon! We’ve got more updates than usual today! Isn’t it exciting? See below for the news: – Installing partitions, paper towel dispensers, and toilet paper dispensers in the restrooms at the Clubhouse – Appliances are starting to be installed in the kitchen of the Clubhouse – Cobia has been filled with water and palm […]

Read More

Weekly Updates: August 24, 2017

August 24, 2017

It’s almost Friday! Look below for some exciting updates on the Clubhouse! ? 1. Metal Roof is complete on the Bath House 2. Partitions are going in the bathrooms in the Clubhouse 3. Rubber flooring is being installed in the Fitness Room of the Clubhouse 4. Flooring has been installed in the hallway and offices of […]

Read More

Weekly Update: August 22, 2017

August 22, 2017

Did you watch the solar eclipse yesterday? It was a sight to see wasn’t it? You know what else is a sight to see? The Cobia here at Kingfish Bay! Updates are listed below: – The Cobia pool is plastered and the pavers are down. – Fence is going up around the pool at the […]

Read More

Weekly Update: August 16, 2017

August 16, 2017

Summer’s almost over… but construction on the Courtyard Villas has just begun! Check out more updates below: – Building has begun on CV-3 – Building has begun on C-11 – Sod has been added to the side of the Marlin – Countertops are being installed in the Clubhouse – The Cobia pool is getting tiled […]

Read More

Weekly Update: August 3, 2017

August 3, 2017

Friday is almost here! Hope everyone’s been having a wonderful week so far! Here are a couple updates at Kingfish Bay: – The Cobia front door and shutters have been painted and installed – Construction for the pool at the Cobia has begun  

Read More

Weekly Update: August 1, 2017

August 1, 2017

Check out what’s happening this week at Kingfish Bay below! We’ve got lots of exciting news and photos coming your way. – Accent painting is being completed in the clubhouse – Cabinets are installed in the Clubhouse – One retainer wall is complete – Work has begun on the second retainer wall       […]

Read More

Weekly Update: July 27, 2017

July 27, 2017

Good morning everyone! Here’s what’s new at Kingfish Bay this week: – We are progressing with the framing of the Bath House – Retaining wall for the pool – Painting the interior of the clubhouse – Installing irrigation at the front entrance And… – The driveway is completed for the Marlin!! #success Check back next […]

Read More

Weekly Updates: July 19, 2017

July 19, 2017

Happy Wednesday! Here are a few updates from this week: 1) Roof framing has begun on the Bath House 2) Interior Clubhouse painting is underway 3) Concrete is being poured for the Marlin driveway and walkway to the pool area 4) Ceramic tile back splash is going up in the Angelfish

Read More

Weekly Update: June 20, 2017

June 20, 2017

Good afternoon! We hope everyone is having a wonderful week! ?Here are a few construction updates for today: – Interior trim being completed on the Clubhouse – Grading for the Cottage Lots – More progress with the exterior paint on the Clubhouse – Loggers are finishing up at Sunset Pointe in Phase 2

Read More

Weekly Update: June 14, 2017

June 14, 2017

Things are moving at Kingfish Bay! Below are a few of the most recent additions we’ve been working on: – electrical and under slab plumbing for the Bath House – putting sheetrock up in the Clubhouse – painting the exterior of the Clubhouse – removing trees and grading Courtyard lots – planting trees at the […]

Read More
marlin pool

Weekly Update: June 7, 2017

June 7, 2017

Weekly updates. Landscaping/pool for the Courtyard of the “Marlin” Model 

Read More