Check out October 22nd’s Kingfish Bay Construction Updates. Enjoy the Riverfront Lifestyle of Kingfish Bay AND the beach life with our Oceanfront Clubhouse at Sunset Beach! Slab poured for C-12 Albacore II Framing C-40 Albacore II Insulation CV-17 Tarpon Framing B-22 Angelfish Finishing siding installation B-2 Seahorse Under slab plumbing B-3 Seahorse Under slab plumbing […]

Read More

Weekly Update: October 17, 2019

October 17, 2019

Check out October 17th’s Kingfish Bay Construction Updates. “The trees are in their autumn beauty; The woodland paths are dry; Under the October twilight; The water mirrors a still sky.” ~ William Butler Yeats Prepping for slab C-12 Albacore II Slab poured C-40 Albacore II Landscaping complete C-55 Albacore II Pavers around pool CV-14 Longfin […]

Read More

Weekly Update: October 10, 2019

October 10, 2019

Check out October 10th’s Kingfish Bay Construction Updates. Besides our residents LIVING RELAXED, this is what’s happening around Kingfish today…. Prepping for slab C-40 Albacore II Continuing siding installation CV-17 Tarpon B-22 Angelfish prepped and ready for slab Landscaping B-25 Angelfish Tiled master shower SF-27 Amberjack Cabinets installed SF-27 Amberjack Roofing installed C-23 Parrot Fish […]

Read More

Brunswick County Parade of Homes

October 9, 2019

WE LOOK FORWARD TO SEEING YOU! October 18th-20th and October 25th-27th, 12noon – 5pm each day KINGFISH BAY HOMES 3, 4 and 5. Click here to ENJOY the 2019 PARADE OF HOMES MAGAZINE

Read More

Weekly Update: October 08, 2019

October 8, 2019

Check out October 8th’s Kingfish Bay Construction Updates. October, a month of apples and oysters … and, well, Calabash! Under slab plumbing C-12 Albacore II Under slab plumbing C-40 Albacore II Starting to install siding CV-17 Tarpon Under slab plumbing B-22 Angelfish Painting top veranda B-25 Angelfish B-28 Angelfish house wrapped Rough-in plumbing trim-out complete […]

Read More

Weekly Update: October 03, 2019

October 3, 2019

Check out October 3rd’s Kingfish Bay Construction Updates. Kingfish Bay now has over 19 Home Designs to choose from. Which one will you call HOME? Framed foundation C-12 Albacore II Landscaping C-55 Albacore II Plumbing for pool CV-14 Longfin Roofing CV-17 Tarpon Foundation framed B-22 Angelfish Framing B-28 Angelfish Framed B-2 Seahorse Primed interior SF-27 […]

Read More

October 2019 Newsletter

October 1, 2019

The KINGFISH BAY October 2019 Newsletter Happy Autumn! FALL in Love with Kingfish Bay. “And all at once, summer collapsed into fall.” ~ Oscar Wilde Introducing The SABLEFISH from Kingfish Bay’s New GRANDE ISLES COLLECTION Front Cover and Special Feature in GRAND STRAND NEW HOME GUIDE The Carolina Coast … a Special Place to Live […]

Read More

Weekly Update: October 01, 2019

October 1, 2019

Check out October 1st’s Kingfish Bay Construction Updates. Kingfish Bay is as HOME as Apple Pie and Pumpkin Spice! Landscaping CV-15 Tarpon Plumbing trim CV-17 Tarpon Installing flooring C-13 Anchor Coral II Framing foundation for B-22 Angelfish Shower tile B-25 Angelfish Continuing to frame B-28 Angelfish Slab poured for B-2 Seahorse Framing C-23 Parrot Fish […]

Read More

Weekly Update: September 26, 2019

September 26, 2019

Check out September 26th’s Kingfish Bay Construction Updates. FALL in Love with Kingfish Bay! Flooring installed CV-8 Longfin Concrete shot for pool CV-14 Longfin Windows set for CV-17 Tarpon Poured driveway for C-13 Anchor Coral II Retaining wall behind C-41 Anchor Coral II Pavers installed for pool C-41 Anchor Coral II Poured front walkway for […]

Read More

Weekly Update: September 24, 2019

September 24, 2019

Check out September 24th’s Kingfish Bay Construction Updates. “And all at once, summer collapsed into fall.” ~ Oscar Wilde  HAPPY AUTUMN! Painted and installed shutters CV-14 Longfin House wrapped CV-17 Tarpon Framed for driveway C-13 Anchor Coral II Railing on top porch of B-25 Angelfish Slab poured B-28 Angelfish Under slab plumbing B-2 Seahorse Sanding […]

Read More

Weekly Update: September 19, 2019

September 19, 2019

Check out September 19th’s Kingfish Bay Construction Updates. Isn’t it time to LIVE RELAXED at Kingfish Bay? Installed bathroom countertops CV-8 Longfin Installed cabinets CV-8 Longfin Interior lighting CV-18 Longfin CV-17 Tarpon underroof Installing tile flooring C-13 Anchor Coral II Decorative knee wall C-13 Anchor Coral II Working on the second-floor porch B-25 Angelfish Drywall […]

Read More

Weekly Update: September 17, 2019

September 17, 2019

Check out September 17th’s Kingfish Bay Construction Updates. Kingfish Bay on the North Carolina coast, with 300 miles of barrier-island beaches! A special place to call home. <3 Showers tiled for CV-8 Longfin Floor tiled CV-8 Longfin Plumbing fixtures set CV-18 Longfin Flooring installed CV-18 Longfin Continuing to be framed CV-17 Tarpon Foundation framed for […]

Read More

Weekly Update: September 12, 2019

September 12, 2019

Check out September 12th’s Kingfish Bay Construction Updates. Kingfish Bay in Calabash, North Carolina, a delightful waterfront town with amazing seafood, boutique shopping opportunities, and the area is home to dozens of top-rated golf courses! Countertops installed CV-14 Longfin Plumbing and bathroom hardware installed CV-14 Longfin Framing CV-17 Tarpon Railings installed B-25 Angelfish Countertops installed […]

Read More

Weekly Update: September 10, 2019

September 10, 2019

Check out September 10th’s Kingfish Bay Construction Updates. A private gated community located on 60+ acres of scenic hardwood forest, wetlands, and coastal bluffs. Absolutely stunning! Painting interior of CV-8 Longfin CV-14 Longfin pool ready for concrete Starting to frame CV-17 Tarpon Flooring B-25 Angelfish Insulation B-31 Seahorse Siding complete B-31 Seahorse Starting to prime […]

Read More

Weekly Update: September 3, 2019

September 3, 2019

Check out September 3rd’s Kingfish Bay Construction Updates. Beautiful things are happening at Kingfish Bay. Cabinets are being installed in B-25 Angelfish Siding installation B-31 Seahorse Interior trim CV-8 Longfin Framed and Rebar in CV-14 Longfin pool Railings installed CV-18 Longfin Interior painted CV-18 Longfin

Read More

September 2019 Newsletter

August 29, 2019

The KINGFISH BAY September 2019 NewsletterLabor Day marks the end of Summer … but at Kingfish Bay, you’re allowed to still wear white, eat hot dogs, and work at RELAXING all year long! Introducing The BLUEFIN from Kingfish Bay’s New GRANDE ISLES COLLECTION NEW WATERFRONT PARK for the Town of Calabash The Carolina Coast … […]

Read More

Weekly Update: August 29, 2019

August 29, 2019

Check out August 29th’s Kingfish Bay Construction Updates. Kingfish Bay … where Living Relaxed is a way of life. Starting to prime interior or CV-8 Longfin Accent at knee wall CV-18 Longfin Cabinets are being installed CV-18 Longfin Slab poured CV-17 Tarpon Interior painting completed B-25 Angelfish Rough plumbing B-31 Seahorse Rough HVAC B-31 Seahorse […]

Read More

Weekly Update: August 27, 2019

August 27, 2019

Check out August 27th’s Kingfish Bay Construction Updates. Live the dream … relaxed. Mudded and taped drywall CV-8 Longfin Pool CV-14 Longfin Fireplace tiled CV-14 Longfin Foundation prepped and ready for slab CV-17 Tarpon Drywall taped and mudded C-13 Anchor Coral II Tile in pool C-41 Anchor Coral II Painting interior of B-25 Angelfish Painted […]

Read More

Weekly Update: August 22, 2019

August 22, 2019

Check out August 22nd’s Kingfish Bay Construction Updates. Are you ready to LIVE RELAXED yet? Driveway poured C-55 Albacore II Mudding drywall CV-8 Longfin Starting to tile fireplace CV-14 Longfin Installed barn doors CV-14 Longfin Painted front door CV-18 Longfin Drywall C-13 Anchor Coral II Painting exterior of B-25 Angelfish Tile installed C-32 Parrotfish II […]

Read More

Weekly Update: August 20, 2019

August 20, 2019

Check out August 20th’s Kingfish Bay Construction Updates. There’s still room for you in paradise. Shower door C-55 Albacore II Mirror and bathroom accessories C-55 Albacore II Drywall CV-8 Longfin Shiplap accent wall installed CV-18 Longfin Tower accent installed CV-18 Longfin Foundation framed and under slab plumbing CV-17 Tarpon Backsplash in kitchen of C-41 Anchor […]

Read More

Weekly Update: August 15, 2019

August 15, 2019

Check out August 15th’s Kingfish Bay Construction Updates. Surround yourself with the natural beauty of the Carolina Coast … at Kingfish Bay. Fencing post C-14 Albacore II Backsplash installed C-55 Albacore II Lighting Fixtures CV-14 Longfin Shutters installed CV-18 Longfin Insulation C-13 Anchor Coral II Carpet installed C-41 Anchor Coral II Siding installation almost complete […]

Read More

Weekly Update: August 13, 2019

August 13, 2019

Check out August 13th’s Kingfish Bay Construction Updates. If a tropical paradise is what you seek … check out Kingfish Bay, right here in Calabash, North Carolina. Sod and landscaping C-14 Albacore II HVAC trim out CV-8 Longfin Flooring installed CV-14 Longfin Interior primed CV-18 Longfin Painted exterior of C-13 Anchor Coral II Siding B-25 […]

Read More

Weekly Update: August 8, 2019

August 8, 2019

Check out August 8th’s Kingfish Bay Construction Updates. Building beautiful homes in paradise … it’s what we do. Driveway/walkway framed C-55 Albacore II Painted exterior CV-8 Longfin Cabinets installed CV-14 Longfin Tile in bathrooms CV-18 Longfin Siding installation almost complete C-13 Anchor Coral II Driveway/walkway framed C-41 Anchor Coral II Insulation B-25 Angelfish Driveway poured […]

Read More

August 2019 Newsletter

August 6, 2019

The KINGFISH BAY August 2019 Newsletter Midsummer Night’s Dream … Kingfish Bay! Introducing The ORCHID from Kingfish Bay’s New TROPICALE COLLECTION Midsummer Night’s Dream … A Pool! The Carolina Coast … a Special Place to Live Highlight Reel of July Progress Calabash, on the Intracoastal Waterway Upcoming Events Choose Your Home Plan Today! Click on […]

Read More

Weekly Update: August 6, 2019

August 6, 2019

Check out August 6th’s Kingfish Bay Construction Updates. Kingfish Bay is located within walking distance of downtown Calabash and allows direct access to the Intracoastal Waterway via the Calabash River. More landscaping added C-14 Albacore II Interior light fixtures C-55 Albacore II Countertops and glass cabinet doors installed C-55 Albacore II Caulking exterior prepping to […]

Read More

Weekly Update: August 1, 2019

August 1, 2019

Check out August 1st’s Kingfish Bay Construction Updates. Live Relaxed at Kingfish Bay, not just a beautiful place to live, but a lifestyle. Electrical trim B-25 Angelfish Starting to install siding C-13 Anchor Coral II Adding palm trees C-14 Albacore II Exterior lighting installed C-55 Albacore II Continuing to install siding CV-8 Longfin Drywall delivered […]

Read More

Weekly Update: July 30, 2019

July 30, 2019

Check out July 30th’s Kingfish Bay Construction Updates. Kingfish Bay, offering an extraordinary lifestyle. HVAC trim for B-25 Angelfish House wrapped B-31 Seahorse Sliding doors installed C-13 Anchor Coral II Driveway and walkway framed for concrete C-32 Parrotfish II Siding installation CV-8 Longfin Interior painted CV-14 Longfin Insulation CV-18 Longfin Prepping foundation for slab SF-27 […]

Read More

Weekly Update: July 25, 2019

July 25, 2019

Check out July 25th’s Kingfish Bay Construction Updates. Recognized by ideal-LIVING Magazine as one of 2019’s BEST OF THE BEST Wellness/Fitness Communities and 2017’s BEST OF THE BEST in Planned Communities. Installed bathroom countertops in C-55 Albacore II Installed roofing CV-8 Longfin Interior trim CV-14 Longfin Fireplace set CV-18 Longfin Rough plumbing trim CV-18 Longfin […]

Read More

Weekly Update: July 23, 2019

July 23, 2019

Check out July 23rd’s Kingfish Bay Construction Updates. Beautiful scenery, luxurious homes, and relaxed living … all waiting for you at Kingfish Bay! Bathroom tiled CV-14 Longfin Exterior is getting painted on CV-18 Longfin (2 pics) Landscaping added to CV-20 Longfin Roofing installed C-13 Anchor Coral II Windows and door set on C-13 Anchor Coral […]

Read More

Weekly Update: July 18, 2019

July 18, 2019

Check out July 18th’s Kingfish Bay Construction Updates. A laid-back atmosphere amidst the natural beauty of the Carolina Coast! Shower door installed C-14 Albacore II Cabinets installed C-55 Albacore II Windows set in CV-8 Longfin HVAC trim out CV-8 Longfin Roof installed on CV-14 Longfin Continuing to install siding CV-18 Longfin Rebar for the pool […]

Read More

Weekly Update: July 16, 2019

July 16, 2019

Check out July 16th’s Kingfish Bay Construction Updates. Come enjoy a relaxing resort lifestyle at Kingfish Bay, an ideal-LIVING “Best of the Best” planned community!  Wrapping house CV-8 Longfin Priming interior CV-14 Longfin Installed tile CV-14 Longfin Shower door installed CV-15 Tarpon Rough plumbing trim C-13 Anchor Coral II Flooring installation C-41 Anchor Coral II […]

Read More

Weekly Update: July 11, 2019

July 11, 2019

Check out July 11th’s Kingfish Bay Construction Updates. ALL ABOARD THE KINGFISH BAY TROLLEY! Next stop, the Kingfish Bay Oceanfront Clubhouse at Sunset Beach!  Pavers installed C-14 Albacore II Final plumbing trim, hardware, and accessories installed C-14 Albacore II Appliances installed C-14 Albacore II Tile installed C-55 Albacore II Stairs, handrail and trim installed C-55 […]

Read More

Weekly Update: July 9, 2019

July 9, 2019

Check out July 9th’s Kingfish Bay Construction Updates. A Relaxed Vision for One of the Fastest Growing Counties in America! ~ ideal-LIVING Magazine  Installed shiplap accent C-55 Albacore II Primed interior C-55 Albacore II Framing CV-8 Longfin Finished installing the siding CV-14 Longfin Beginning to paint exterior of CV-14 Longfin Rough plumbing trim CV-18 Longfin […]

Read More

July 2019 Newsletter

July 3, 2019

The KINGFISH BAY July 2019 NewsletterHave a wonderful 4TH OF JULY! Introducing “BLUE DAWN” from Kingfish Bay’s New TROPICALE COLLECTION One of the BEST Wellness/Fitness Communities The Carolina Coast … a Special Place to Live Highlight Reel of June Progress Logs Floating Down the Calabash River Upcoming Events Choose Your Home Plan Today! Click on […]

Read More

Weekly Update: July 2, 2019

July 2, 2019

Check out July 2nd’s Kingfish Bay Construction Updates. Kingfish Bay, 2019 BEST OF THE BEST Wellness/Fitness Community! Landscaping and shutters installed C-5 Cobia Painted exterior C-55 Albacore II Framing CV-8 Longfin Installing siding and installed roofing CV-14 Longfin Set windows and house wrap CV-18 Longfin Starting to frame C-13 Anchor Coral II Backsplash B-20 Seahorse […]

Read More

Weekly Update: June 27, 2019

June 27, 2019

Check out June 27th’s Kingfish Bay Construction Updates. Kingfish Bay, a tropical-themed, private-gated community set along the banks of the Calabash River. Exterior light fixtures installed C-14 Albacore II Prepping to paint exterior of C-55 Albacore II Fence painted C-15 Anchor Coral Prepped and ready for slab to be poured CV-8 Longfin Installing HVAC system […]

Read More

Weekly Update: June 25, 2019

June 25, 2019

Check out June 25th’s Kingfish Bay Construction Updates. Lot’s going on! Fireplace installed C-55 Albacore II Stairs C-55 Albacore II Sod and landscaping complete for C-15 Anchor Coral Pool and pavers C-15 Anchor Coral Fencing installed C-15 Anchor Coral Starting to prep for siding installation CV-14 Longfin Framing and sheathing CV-18 Longfin Under slab plumbing […]

Read More

Weekly Update: June 20, 2019

June 25, 2019

Check out June 20th’s Kingfish Bay Construction Updates.Kingfish Bay, a resort to call home. • Driveway poured for C-14 Albacore II• Flooring installed for C-14 Albacore II• Drywall C-55 Albacore II• Windows set in CV-14 Longfin• Starting to frame CV-18 Longfin• Shutters installed, front door painted CV-15 Tarpon• Countertop installed CV-15 Tarpon• Shutters installed on […]

Read More

Weekly Update: June 18, 2019

June 25, 2019

Check out June 18th’s Kingfish Bay Construction Updates.Kingfish Bay, simply paradise. • House wrap CV-14 Longfin• Pouring concrete slab CV-18 Longfin• Lighting fixtures in CV-15 Tarpon• Installed plumbing fixtures in B-20 Seahorse• Installed shower door in B-20 Seahorse• Starting to paint interior of C-41 Anchor Coral II• Tiled shower in C-41 Anchor Coral II• Drywall […]

Read More

June 2019 Newsletter

June 25, 2019

The KINGFISH BAY June 2019 NewsletterKingfish Bay, recognized by Ideal-LIVING Magazine as one of the BEST Wellness/Fitness Communities! Introducing “The JASMINE” from Kingfish Bay’s New TROPICALE COLLECTION One of the BEST Wellness/Fitness Communities The Carolina Coast … a Special Place to Live Highlight Reel of May Progress Available Homes Calabash – The Fishing Village Upcoming […]

Read More

Weekly Update: June 13, 2019

June 20, 2019

Check out June 13th’s Kingfish Bay Construction Updates. Kingfish Bay, a community fostering a sense of “community by design”. Pouring concrete for B-20 Seahorse walkway Painting exterior siding C-41 Anchor Coral II Painting exterior trim C-41 Anchor Coral II Siding installation continues on C-55 Albacore II Sheathing almost complete on CV-14 Longfin Poured concrete for […]

Read More

Weekly Update: June 11, 2019

June 20, 2019

Check out June 11th’s Kingfish Bay Construction Updates. The Kingfish Bay community includes 2 piers with pavilions and day docks with direct access to the Intracoastal Waterway! Magnificent! Roofing installed and beginning to install siding on C-55 Albacore II Carpet installed in CV-20 Longfin Appliances installed in CV-20 Longfin Framing CV-14 Longfin Under slab plumbing […]

Read More

Weekly Update: June 6, 2019

June 20, 2019

Check out June 6th’s Kingfish Bay Construction Updates. Kingfish Bay is set along the banks of the Calabash River with approximately 1/3 of the property maintained in its natural state … beautiful! Installing roof felt on C-55 Albacore II Roof trusses installed CV-14 Longfin Framed foundation CV-18 Longfin B-20 Seahorse flooring completely installed Siding and […]

Read More

Weekly Update: June 4, 2019

June 6, 2019

Check out June 4th’s Kingfish Bay Construction Updates.Kingfish Bay fosters a sense of “community by design,” complete with an on-site clubhouse, fitness center, resort-style pool, and nature pavilion. • Driveway poured C-5 Cobia• Cabinets installed C-14 Albacore II• Set window in C-55 Albacore II• Framing and sheathing CV-14 Albacore II• Cabinets are being installed in […]

Read More

Weekly Update: May 30, 2019

June 6, 2019

Check out May 30th’s Kingfish Bay Construction Updates.A resort-style community with a Caribbean flare located in the quaint coastal town of Calabash, NC! • Tile installed in C-14 Albacore II• House wrapped C-55 Albacore II• CV-15 Tarpon interior painted• Framing CV-14 Longfin• Sidewalk poured CV-20 Longfin• Interior lighting installed in B-20 Seahorse• Flooring beginning to […]

Read More

Weekly Update: May 28, 2019

June 6, 2019

Check out May 28th’s Kingfish Bay Construction Updates.Kingfish Bay has just been chosen as one of the Best Wellness/Fitness communities by Ideal-LIVING magazine and will be showcased in their fourth annual Summer 2019 Best of the Best special issue! • Installing interior light fixtures C-14 Albacore II • Framing C-55 Albacore II• Installing countertops CV-20 Longfin• […]

Read More

Weekly Update: May 23, 2019

May 23, 2019

Check out May 23rd’s Kingfish Bay Construction Updates. Kingfish Bay … just minutes from North Myrtle Beach and Sunset Beach – yet miles away from the worries of the world. Installing tile around the pool C-15 Anchor Coral Installed spa tub in C-15 Anchor Coral Starting to add landscaping to C-15 Anchor Coral Continuing to […]

Read More

Weekly Update: May 21, 2019

May 22, 2019

Check out May 21st’s Kingfish Bay Construction Updates. Relaxed Living comes naturally at Kingfish Bay Painting interior C-14 Albacore II Framing C-55 Albacore II Installing tile in CV-15 Tarpon Installed hardware on cabinetry CV-20 Longfin Poured slab CV-14 Longfin Doors installed B-20 Seahorse Accent walls B-20 Seahorse Poured slab C-32 Parrotfish II

Read More

Weekly Update: May 16, 2019

May 16, 2019

Check out May 16th’s Kingfish Bay Construction Updates. Overlooking the Calabash River, Kingfish Bay is a private gated community located on 60+ acres of scenic hardwood forest, wetlands, and coastal bluffs. Painted the exterior of B-20 Seahorse Staring to install trim in C-14 Albacore II Under slab plumbing C-32 Parrotfish II Under slab plumbing CV-14 […]

Read More

Weekly Update: May 14, 2019

May 14, 2019

Check out May 14th’s Kingfish Bay Construction Updates. Enjoy a luxurious 3 Day / 2 Night Mini-Vacation at Kingfish Bay for $189 and see for yourself what an incredible community this is! Tile accents around fireplace C-15 Anchor Coral Pavers around pool C-5 Cobia Stone accents around fireplace C-5 Cobia Painted exterior C-14 Albacore II […]

Read More

Weekly Update: May 9, 2019

May 9, 2019

Check out May 9th’s Kingfish Bay Construction Updates. A private gated community located on 60+ acres of scenic hardwood forest, wetlands, and coastal bluffs! Installing the shake on B-20 Seahorse Starting to paint the exterior of C-14 Albacore II 1st coast of paint on fencing by C-17 Albacore C-41 Anchor Coral II is under roof […]

Read More

Weekly Update: May 7, 2019

May 7, 2019

Check out May 7th’s Kingfish Bay Construction Updates. Experience the best of both worlds in Calabash, NC, where natural beauty and modern convenience come together to create a unique slice of the good life. Drywall up and taped C-14 Albacore II Caulking the exterior C-14 Albacore II Under slab plumbing C-55 Albacore II Still painting […]

Read More

Weekly Update: May 2, 2019

May 2, 2019

Check out May 2nd’s Kingfish Bay Construction Updates. Kingfish Bay was a vision long before it became a reality – a vision of Relaxed Living in an active and friendly community built on one of the prettiest spots on the East Coast! Installing the siding for B-20 Seahorse Drywall installed C-14 Albacore II Continuing to […]

Read More

May 2019 Newsletter

May 2, 2019

See what we’re up to! Introducing “The ALPINIA” from Kingfish Bay’s New TROPICALE COLLECTION Sunset Beach Clubhouse Update The Carolina Coast … a Special Place to Live Highlight Reel of April Progress … and Ground Breaking of MULTIPLE HOMES in May! Available Homes Jimmy Durante Upcoming Events Choose Your Home Plan Today! Click on this […]

Read More

Weekly Update: April 30, 2019

April 30, 2019

Check out April 30th’s Kingfish Bay Construction Updates. Homes designed to enhance a natural living experience. Pool C-15 Anchor Coral Interior light fixtures installed C-15 Anchor Coral Starting to frame C-41 Anchor Coral II Installed mirrors in C-5 Cobia Siding C-14 Albacore II Painting the exterior of CV-15 Tarpon Framed the exterior stairs CV-15 Tarpon […]

Read More

Weekly Update: April 25, 2019

April 25, 2019

Check out April 25th’s Kingfish Bay Construction Updates. Let us build your nest. C-15 Anchor Coral pool formed and ready for Shotcrete C-15 Anchor Coral light fixtures being installed C-17 Albacore & C-18 Albacore II fence being installed C-14 Albacore II rough-ins complete, ready for insulation CV-15 Tarpon has siding being installed CV-15 Tarpon insulation […]

Read More

Weekly Update: April 18, 2019

April 18, 2019

Check out April 18th’s Kingfish Bay Construction Updates. A special place to live. Prepping to pour slab on C-41 Anchor Coral II Foundation framed for C-55 Albacore II Installing insulation CV-15 Tarpon Installing siding CV-15 Tarpon Installing siding CV-20 Longfin

Read More

Weekly Update: April 16, 2019

April 16, 2019

Check out April 16th’s Kingfish Bay Construction Updates. There’s nothing quite like having it all – just the way you want it. Rebar in pool C-15 Anchor Coral Appliances installed C-15 Anchor Coral Starting to install siding CV-15 Tarpon Drywall in CV-20 Longfin B-20 Seahorse windows are set Foundation framed and under slab plumbing C-41 […]

Read More

Weekly Update: April 11, 2019

April 11, 2019

Check out April 11th’s Kingfish Bay Construction Updates. We’re ready to build your home. Ready to LIVE RELAXED? Framed for pool C-15 Anchor Coral Backsplash C-5 Cobia Landscaping for C-17 Albacore Starting to install fence behind C-17 Albacore and C-18 Albacore II Installed roofing on CV-15 Tarpon Insulation installed CV-20 Longfin B-20 Seahorse is under […]

Read More

Weekly Update: April 9, 2019

April 9, 2019

Check out April 9th’s Kingfish Bay Construction Updates. Come on home. Grading to prep for pool C-15 Anchor Coral Light fixtures installed C-17 Albacore Windows set for C-14 Albacore II Landscaping almost complete for C-18 Albacore II Running electrical wires CV-15 Tarpon Roof installed CV-20 Longfin Starting to install insulation CV-20 Longfin Starting to frame […]

Read More

AVAILABLE NOW! 1209 Kingfish Blvd; Calabash, NC

April 9, 2019

~ 3 Bedrooms / 2.5 Bathrooms / Flex Room / Bonus Room ~ This 2,260 sq ft Marlin Courtyard Villa features a large kitchen island, open to the dining area and great room. This smooth flowing 2-story floorplan with spacious 2 car garage is terrific for entertaining family and friends and … it’s ready to […]

Read More

Weekly Update: April 4, 2019

April 9, 2019

Check out April 4th’s Kingfish Bay Construction Updates. Quality and care are built right in. Working on the landscaping design for C-18 Albacore II Cv-15 Tarpon Rough HVAC & Plumbing installed (2 pics) Poured the slab for B-20 Seahorse Constructing curb around the round about

Read More

Weekly Update: April 2, 2019

April 9, 2019

Check out April 2nd’s Kingfish Bay Construction Updates. At Kingfish Bay, the breathtaking views and natural setting is just the beginning of the journey.  Installed flooring C-15 Anchor Coral Tile installed C-15 Anchor Coral Installed cabinets and set appliances C-5 Cobia Countertops have been installed C-5 Cobia Flooring has been installed C-5 Cobia Frame detail […]

Read More

Weekly Update: March 28, 2019

April 9, 2019

Check out March 28th’s Kingfish Bay Construction Updates. Building paradise … just for you! Installed cabinets in C-15 Anchor Coral Starting to tile the bathroom floor in C-15 Anchor Coral Painted the exterior trim of C-15 Anchor Coral Set windows on C-14 Albacore II Set windows for CV-15 Tarpon Starting to install rough HVAC in […]

Read More

Weekly Update: March 26, 2019

March 26, 2019

Check out March 26th’s Kingfish Bay Construction Updates. Building an entire community …  around RELAXED LIVING. Beginning to install cabinets in C-15 Anchor Coral Installed backsplash in C-17 Albacore Installed counter tops C-17 Albacore Installed appliances C-17 Albacore Framing C-14 Albacore II Framing CV-15 Tarpon House wrapped and windows set for CV-20 Longfin

Read More

Weekly Update: March 21, 2019

March 26, 2019

Check out March 21st’s Kingfish Bay Construction Updates. Marching ahead! Installed garage door on C-5 Cobia Bahama shutter installed on C-17 Albacore Framed for driveway C-17 Albacore Underground electric C-17 Albacore Framing C-14 Albacore II Framing CV-15 Tarpon Framing CV-20 Longfin

Read More

Weekly Update: March 19, 2019

March 26, 2019

Check out March 19th’s Kingfish Bay Construction Updates. More sticks going up! First coat of interior paint has been applied and interior trim installed C-15 Anchor Coral Starting to paint the final coat of interior paint C-17 Albacore Appliances have been installed in Albacore II Driveway slab poured for C-18 Albacore II Slab has been […]

Read More

Weekly Update: March 14, 2019

March 14, 2019

Check out March 14th’s Kingfish Bay Construction Updates. Spring is beginning to SPRING! Starting to frame CV-20 Longfin C-14 Albacore II is prepped and ready for slab to be poured Flooring has been installed in C-17 Albacore Countertops have been installed in C-17 Albacore

Read More

Weekly Update: March 12, 2019

March 12, 2019

Check out March 12th’s Kingfish Bay Construction Updates. LIGHTS … PAINT … ACTION! From slab to finish, we’re building homes and a community where you can LIVE RELAXED. Installing light fixtures in C-5 Cobia Painting the interior C-15 Anchor Coral Finished the final HVAC trim C-17 Albacore Framed foundation for C-14 Albacore II Framed for […]

Read More

Weekly Update: March 7, 2019

March 7, 2019

Check out March 7th’s Kingfish Bay Construction Updates. A great community starts with a great foundation! Kingfish Bay is currently working on 3 great foundations, an Albacore II, a Tarpon, and a Longfin. =) Starting to frame the foundation for C-14 Albacore II Starting to install doors and interior trim in C-15 Anchor Coral Continuing […]

Read More

AVAILABLE NOW! 1204 Kingfish Blvd; Calabash, NC

March 7, 2019

~ 3 Bedrooms / 3.5 Bathrooms / Flex Room / Bonus Room / Guest Suite ~ This home is ready to MOVE IN NOW. Come live in paradise and enjoy this Gated Waterfront Community with On-Site Clubhouse complete with Kitchen, Lounge, Fitness Center, & Resort Style Pool and Hot Tub; Putting Green, Game Court, Picnic […]

Read More

You Are Invited to Come LIVE RELAXED at Kingfish Bay

March 7, 2019

Overlooking the Calabash River, Kingfish Bay is a private gated community located on 60+ acres of scenic hardwood forest, wetlands, and coastal bluffs. With its breathtaking views and natural setting, the community was built with the natural beauty of the area in mind. And the homes are designed to highlight the scenic surroundings of the […]

Read More

Weekly Update: March 5, 2019

March 7, 2019

Check out March 5th’s Kingfish Bay Construction Updates. A Caribbean Resort Style village … right here in Calabash. Painted the door of C-5 Cobia Finished the tile work in C-5 Cobia Painted the exterior of C-15 Anchor Coral Finished the tile work in the shower of C-17 Albacore Painting the interior of C-17 Albacore Painted […]

Read More

Weekly Update: February 28, 2019

March 7, 2019

Check out February 28th’s Kingfish Bay Construction Updates. A place to call home. Added more shrubs/bushes to the exterior of B-32 Seahorse Painting the interior of C-5 Cobia Installed tub in C-15 Anchor Coral Installed the metal roofing and shingles for C-15 Anchor Coral Installed the fireplace in C-15 Anchor Coral Installed the cabinets in […]

Read More

Weekly Update: February 26, 2019

March 7, 2019

Check out February 26th’s Kingfish Bay Construction Updates. Fourteen models to choose from! Which one will be yours? Starting to work on the landscaping for B-32 Seahorse Poured the sidewalk for B-32 Seahorse Starting to install tile in the bathroom and shower of C-5 Cobia Mudding the drywall for C-15 Anchor Coral Painted the exterior […]

Read More

Weekly Update: February 21, 2019

February 21, 2019

Check out February 21st’s Kingfish Bay Construction Updates. What a community!  And getting better each day! Starting to paint the interior of C-5 Cobia Shower is prepped and ready for tile C-5 Cobia Insulation installed for C-15 Anchor Coral Starting to hang drywall in C-15 Anchor Coral (2 pics) Interior trim/doors have been installed for […]

Read More

Weekly Update: February 19, 2019

February 19, 2019

Check out February 19th’s Kingfish Bay Construction Updates. Kingfish Bay is a place to call home. You ready? Painted and installed the shutters for B-5 Sand Dollar Laying river rock around the plants for B-5 Sand Dollar Installed countertops in B-32 Seahorse Installed exterior electrical fixtures for B-32 Seahorse Painted the exterior of C-5 Cobia […]

Read More

Weekly Update: February 14, 2019

February 14, 2019

Check out February 14th’s Kingfish Bay Construction Updates. Fall in love with RELAXED LIVING! Laying sod for B-5 Sand Dollar Finished installing electrical fixtures for B-32 Seahorse Installed base board in B-32 Finished tiling the shower in B-32 Finished main coat of paint for C-18 Albacore II  

Read More

Weekly Update: February 12, 2019

February 12, 2019

Check out February 12th’s Kingfish Bay Construction Updates. Kingfish Bay …  how sweet it is. B-5 Sand Dollar Appliances are in Carpet installed in the bedrooms Plumbing fixtures are set Front sidewalk has been poured B-32 Seahorse Flooring is being installed Final electrical trim is being completed Tile has been installed in the bathrooms C-5 Cobia […]

Read More

Weekly Update: February 07, 2019

February 7, 2019

Check out February 7th’s Kingfish Bay Construction Updates. When shall we begin building YOUR dream home in paradise? Trees, shrubs, and bushes were added to the front landscape of B-5 Sand Dollar Building front stairs with railing for B-5 Sand Dollar Installing cabinets for B-32 Seahorse Hanging siding and drywall for C-5 Cobia Plumbing trim […]

Read More

Weekly Update: February 05, 2019

February 6, 2019

Check out February 5th’s Kingfish Bay Construction Updates. The Sand Dollar, Seahorse, Cobia, Anchor Coral, Albacore, and Albacore II … all in the works! Shower door installed for B-5 Sand Dollar Starting to tile the shower in B-32 Seahorse Tiling the bathroom floors in B-32 Seahorse Insulation installed in C-5 Cobia Starting to hang siding […]

Read More

Weekly Update: January 31, 2019

January 31, 2019

Check out January 31st’s Kingfish Bay Construction Updates. Building BEAUTIFUL homes in a BEAUTIFUL community! Installing the flooring in B-5 Sand Dollar First coat of interior paint for B-32 Seahorse Framed out the stairs in C-5 Cobia C-15 Anchor Coral is underroof Roofing installation for C-17 Albacore Almost complete with the siding installation for C-18 […]

Read More

Weekly Update: January 29, 2019

January 31, 2019

Check out January 29th’s Kingfish Bay Construction Updates. Exterior and interior work in full swing! Plumbing fixtures installed for B-5 Sand Dollar Gutters installed on B-5 Sand Dollar Metal roof installed for B-32 Seahorse Exterior painted for B-32 Seahorse Framing and setting trusses for C-15 Anchor Coral Continuing to install siding for C-18 Albacore II […]

Read More

Weekly Update: January 24, 2019

January 24, 2019

Check out January 24th’s Kingfish Bay Construction Updates. This is where you want to be! Installed fireplace in C-5 Cobia Installed countertops in B-5 Sand Dollar Starting to install sheetrock in C-18 Albacore II Putting the siding on C-18 Albacore II Starting to paint the interior of B-32 Seahorse Phase 2B Paving Phase 2B/C Paving […]

Read More

Weekly Update: January 22, 2019

January 22, 2019

Check out January 22nd’s Kingfish Bay Construction Updates. Relax and let us build your dream home … and relax … Final electrical trim complete for B-5 Sand dollar Siding installed for B-32 Seahorse Sheetrock taped for B-32 Seahorse Prepping C-15 Anchor Coral for slab to be poured Installing HVAC in C-17 Albacore Insulation installed for […]

Read More

Weekly Update: January 17, 2019

January 22, 2019

Check out January 17th’s Kingfish Bay Construction Updates. Progress! CV-6 Longfin interior and exterior progress C-5 Cobia interior and exterior progress Completing the HVAC trim-out for C-5 Cobia B-5 Sand Dollar interior progress Set the shower/tub combo for B-32 Seahorse Drywalled B-32 Seahorse Completed the plumbing trim for C-17 Albacore Phase 1B progress  

Read More

Weekly Update: January 15, 2019

January 15, 2019

Check out January 15th’s Kingfish Bay Construction Updates. From the bare bones to the finish, Kingfish Bay homes are impressive! Cabinets are installed in B-5 Sand Dollar Windows have been set for C-5 Cobia Framing is complete for C-17 Albacore House and roof wrapped for C-17 Albacore Shingles installed for C-18 Albacore II Installation installed […]

Read More

Weekly Update: January 10, 2019

January 10, 2019

Check out January 10th’s Kingfish Bay Construction Updates. Building dream homes under the beautiful blue Carolina skies! Tile installed in the shower of B-5 Sand Dollar Cabinets have arrived for B-5 Sand Dollar Starting to house wrap C-5 Cobia Graded the foundation for C-15 Anchor Coral Continuing to frame and sheath C-17 Albacore     […]

Read More

Weekly Update: January 8, 2019

January 9, 2019

Check out January 8th’s Kingfish Bay Construction Updates. Off and running, in the New Year! Added plants to the front landscape of CV-6 Longfin Installing pavers around the pool area of CV-6 Longfin C-5 Cobia is under roof Exterior painted for B-5 Sand Dollar Painting the interior of B-5 Sand Dollar Electrical, HVAC, and Plumbing […]

Read More

Weekly Update: January 3, 2019

January 3, 2019

Check out January 3rd’s Kingfish Bay Construction Updates. Framin’ and wrappin’! Finished framing and house wrap installation for B-32 Seahorse Poured slab for C-17 Albacore Finished framing C-18 Albacore II and wrapped house. Windows installed in C-18 Albacore II Starting Rough HVAC installation for C-18 Albacore II Framed the foundation for C-15 Anchor Coral   […]

Read More

Weekly Update: January 2, 2019

January 2, 2019

Check out January 2nd’s Kingfish Bay Construction Updates. Building into the New Year! Construction for the upper and lower level back porch/deck is complete on B-5 Sand Dollar Siding is completely installed on B-5 Sand Dollar Adding trim in the interior of B-5 Sand Dollar Framing and sheathing C-5 Cobia           […]

Read More

WISHING ALL A PEACEFUL, HEALTHY, HAPPY & PROSPEROUS 2019!

December 27, 2018

Happy New Year! Here Are Available Homes To Start It Off Right.   AVAILABLE HOMES         1204 KINGFISH BLVD; CALABASH, NC | MARLIN | 3 BED | 3.5 BATH | 2,260 SQ FT | +330 SQ FT GUEST HOUSE $454,900 MORE INFO         1217 KINGFISH BLVD; CALABASH, NC | TARPON […]

Read More

Weekly Update: December 20, 2018

December 26, 2018

Check out December 20th’s Kingfish Bay Construction Updates. More going up! Are you ready for us to build yours? Framing/sheathing B-32 Seahorse Framing/sheathing C-18 Albacore II          

Read More

Weekly Update: December 18, 2018

December 18, 2018

Check out December 18th’s Kingfish Bay Construction Updates. Getting ready to lounge by the pool! Plastered the pool for CV-6 Longfin Drywall installed for B-5 Sand Dollar Framed foundation for C-17 Albacore Starting to frame C-18 Albacore II                          

Read More

Weekly Update: December 13, 2018

December 18, 2018

Check out December 13th’s Kingfish Bay Construction Updates. Going to great heights to build your dream home! Preparing to install shingles on B-5 Sand Dollar Preparing to grade lot B-3 Slab poured for B-32 Seahorse Slab poured for C-18 Albacore II              

Read More

Weekly Update: December 11, 2018

December 11, 2018

Check out December 11th’s Kingfish Bay Construction Updates. Beauty down to the bare bones! Foundation framed and under slab plumbing for B-32 Seahorse Foundation framed and under slab plumbing for C-18 Albacore II Siding installation almost complete for B-5 Sand Dollar Insulation installed for B-5 Sand Dollar        

Read More

Weekly Update: December 06, 2018

December 6, 2018

Check out December 6th’s Kingfish Bay Construction Updates. We’re building amazing homes for you! Poured concrete for the sidewalk of CV-6 Longin Finishing the driveway for CV-6 Longfin Grading the backyard in C-5 Cobia Continuing to install siding on B-5 Sand Dollar              

Read More

Weekly Update: December 04, 2018

December 4, 2018

Check out December 4th’s Kingfish Bay Construction Updates. We’re still at it! Installed carpet on the stairs and second floor of CV-6 Longfin Starting to install siding for B-5 Sand Dollar        

Read More

Weekly Update: November 29, 2018

November 29, 2018

Check out November 29th’s Kingfish Bay Construction Updates. Are you ready for “A Wonderful Life” at Kingfish Bay? Shower doors installed in CV-6 Longfin Putting up the kitchen backsplash in CV-6 Longfin Painting the exterior of CV-6 Longfin Hole in the ground for CV-6 Longfin pool View looking out to the forest on B-5 Sand […]

Read More

Weekly Update: November 27, 2018

November 27, 2018

Check out November 27th’s Kingfish Bay Construction Updates. Gorgeous! Pool and hot tub for CV-4 Marlin Furniture has been added to the pool area for CV-4 Marlin Shutters and front door painted for CV-6 Longfin Barn doors are installed in CV-6 Longfin Foyer area has been painted with an accent color for CV-6 Longfin Pool […]

Read More

Weekly Update: November 20, 2018

November 20, 2018

Check out November 20th’s Kingfish Bay Construction Updates. Lookin’ good! Painting the exterior of CV-6 Longfin Under roof, house wrapped and windows installed B-5 Sand Dollar Putting curbs and gutters in Phase 2B        

Read More

Weekly Update: November 15, 2018

November 15, 2018

Check out November 15th’s Kingfish Bay Construction Updates. We’re working to make your Dream Home a reality! Have you considered living in paradise? Appliances have been delivered and being installed in CV-6 Longfin Setting the trusses on B-5 Sand Dollar                   

Read More

Weekly Update: November 13, 2018

November 13, 2018

Check out November 13th’s Kingfish Bay Construction Updates. What a gorgeous community! Plumbing fixtures are set in CV-6 Longfin Exterior doors are installed for CV-6 Longfin Starting to frame B-5 Sand Dollar Grass is growing in Phase 2A                    

Read More

Weekly Update: November 8, 2018

November 8, 2018

Check out November 8th’s Kingfish Bay Construction Updates. Some finish work and progress on Phase 2B infrastructure! Installing light fixtures and ceiling fans in CV-6 Longfin Installed countertops in CV-6 Longfin Completing final HVAC trim out on CV-6 Longfin Waterproofing membrane has been installed over the tar sealant on B-5 Sand Dollar Cleaning up the […]

Read More

Weekly Update: November 6, 2018

November 8, 2018

Check out November 6th’s Kingfish Bay Construction Updates. Two new home plans in the works! Flooring has been installed in CV-6 Longfin Handrail has been installed CV-6 Longfin Beginning to install Barn Door Hardware CV-6 Longfin Tar base sealant has been applied to the basement of B-5 Sand Dollar       

Read More

Weekly Update: November 1, 2018

November 1, 2018

Check out November 1st’s Kingfish Bay Construction Updates. Comin’ along! Completed the block work for the basement of B-5 Sand Dollar Cabinets installed in CV-6 Longfin Painting the interior of CV-6 Longfin Tiled the showers in CV-6 Longfin              

Read More

Weekly Update: October 30, 2018

October 30, 2018

Check out October 30th’s Kingfish Bay Construction Updates. A new model’s going up … The Longfin! Installed siding on CV-6 Longfin Installed shutters on CV-6 Longfin Starting to paint the exterior of CV-6 Longfin  

Read More

Weekly Update: October 23, 2018

October 23, 2018

Check out October 23rd’s Kingfish Bay Construction Updates. A community that’s building a great foundation! Installed siding on CV-6 Longfin Tiled showers and floor in CV-6 Preparing to paint the interior of CV-6 Grass is growing nicely in Phase 1 B Hydroseeding parts of Phase 1 B Paved Phase 2 A Painted shutters on B-17 […]

Read More

Weekly Update: October 17, 2018

October 17, 2018

Check out October 17th’s Kingfish Bay Construction Updates. Beautiful creations abound! B-17 Angelfish Carpet has been installed in the second floor B-17 Angelfish Countertops have been installed in the kitchen B-17 Angelfish Backsplash has been installed in the kitchen B-17 Angelfish Lighting fixtures have been installed B-17 Angelfish Shelving has been installed B-17 Angelfish Appliances […]

Read More

Weekly Update: October 2, 2018

October 2, 2018

Check out October 2nd’s Kingfish Bay Construction Updates. Happy Autumn! Starting to paint the interior of Angelfish B-17 Bathroom accessories/hardware are installed in Angelfish B017 Insulation has been installed in Longfin CV-6 Delivering sheet rock today and preparing to install in Longfin CV-6              

Read More

Weekly Update: September 26, 2018

September 27, 2018

Check out September 26th’s Kingfish Bay Construction Updates. Onward and upward! Work on Phase 1B Work on Phase 2A Elevator Installation at Sunset Beach Clubhouse  

Read More

Weekly Update: September 20, 2018

September 20, 2018

Check out September 20th’s Kingfish Bay Construction Updates. Back to it! Flooring installed in B-17 Angelfish Tile installed in B-17 Angelfish Sidewalk framed for front of B-17 Angelfish Windows are set in CV-6 Longfin Pouring concrete for curbs and gutters in Phase 2              

Read More

Kingfish Bay comes out unscathed

September 20, 2018

Thank you all for expressing your concerns about the effects of Hurricane Florence on Kingfish Bay. We did take into consideration the risk of a hurricane when planning the development, homes, and Sunset Beach clubhouse and felt that the properties were secure. That said, the community did come out of the storm virtually unscathed. Our […]

Read More

Weekly Update: September 6, 2018

September 6, 2018

Check out September 6th’s Kingfish Bay Construction Updates. Welcome home! House is completely wrapped on cv-6 longfin Plumbing trim out is complete for cv-6 longfin Front door is painted for B-17 Angelfish Master WIC has shelving and compartments installed for B-17 Angelfish        

Read More

Weekly Update: September 4, 2018

September 5, 2018

Check out September 4th’s Kingfish Bay Construction Updates. Kingfish Bay … a place to call home. Second story balcony/deck for B-17 Angelfish House wrap for CV-6 Longfin Laying out roads for phase 2A              

Read More

Weekly Update: August 30, 2018

August 30, 2018

Check out August 30th’s Kingfish Bay Construction Updates. Nice work! CV-6 is under roof Cabinets have been installed in the second floor bar area of B-17 Angelfish      

Read More

Weekly Update: August 28, 2018

August 29, 2018

Check out August 28th’s Kingfish Bay Construction Updates. Building the Longfin and working on Phase 2! Roof trusses have been set and continue to sheath and frame CV-6 Longfin Cabinets have been installed in B-17 Angelfish Grading Phase 2                

Read More

Weekly Update: August 23, 2018

August 23, 2018

Check out August 23rd’s Kingfish Bay Construction Updates. Moving on to the next phases! Sheathing CV-6 Longfin Hauling loads of dirt for grading Phase 2 Transporting material for the next phases             

Read More

Weekly Update: August 21, 2018

August 22, 2018

Check out August 21st’s Kingfish Bay Construction Updates. Lots going on … and going in … at Kingfish Bay! Installed shutters on B-17 Angelfish Starting to paint the interior of B-17 Angelfish Finished the landscaping for C-7 Albacore II Added river rock to landscape of B-1 Seahorse Starting to frame cv-6 Longfin Progress on Phase […]

Read More

Weekly Update: August 14, 2018

August 14, 2018

Check out August 14th’s Kingfish Bay Construction Updates. Kingfish Bay has it all … even its own Trolley! Drywall is ready for paint B-17 Angelfish Handrail has been installed B-17 angelfish Doors are installed B-17 Angelfish Shower seat has been constructed in master bathroom of B-17 Angelfish Installing gutters on B-1 Seahorse, C-7 Albacore II, […]

Read More

Weekly Update: August 9, 2018

August 9, 2018

Check out August 9th’s Kingfish Bay Construction Updates. Caribbean pastels, lush tropical landscaping, Bahama shutters … and surrounded by the beauty of the Carolina coast. Truly breathtaking! Painted the exterior of B-17 Angelfish Installed carpet in the guest bedroom of CV-7 Tarpon Landscaping is complete in the front yards of CV-7 and CV-9 Tarpons Hot […]

Read More

Weekly Update: August 2, 2018

August 2, 2018

Check out August 2nd’s Kingfish Bay Construction Updates. Nice! Appliances have arrived for B-14 Angelfish Working on trim work in B-17 Angelfish Installed new interior lighting in CV-4 Marlin Installed ceramic and deco tile in C-9 Bonita Starting to install fencing around CV-7 Tarpon Planted shrubbery for CV-7 Tarpon Finished installing CoreTec Flooring in CV-7 […]

Read More

Kingfish Bay CONSTRUCTION UPDATES Tuesday 07/31/18

July 31, 2018

Check out July 31st’s Kingfish Bay Construction Updates. A lot has happened! Lookin’ good! B-14 Angelfish Carpet has been installed Plumbing fixtures have been installed Ceramic tile in the shower has been installed Countertops, cabinets and backsplash have been installed   B-17 Angelfish Started to paint the exterior Installed sheetrock   CV-3 Marlin Completed the […]

Read More

Weekly Update: July 17, 2018

July 17, 2018

Check out July 17th’s Kingfish Bay Construction Updates. Have we started yours yet? Installing the siding on B-17 Angelfish Installing carpet on the stairs and second floor of CV-4 Marlin Installing tile in CV-7 Tarpon Installing tile in CV-9 Tarpon Installed cabinets and countertops on C-7 Albacore II Plastered the pool for C-5 Cobia   […]

Read More

Weekly Update: July 10, 2018

July 10, 2018

Check out July 10th’s Kingfish Bay Construction Updates. More Caribbean style homes going up! Homes built to stand up to the elements … while looking incredible! Starting to install siding on B-17 Angelfish Installed the shingles and metal ribbed roofing accents for B-17 Angelfish Preparing to install concrete pavers and spa for the enhanced landscaping […]

Read More

Weekly Update: July 3, 2018

July 3, 2018

Check out July 3rd’s Kingfish Bay Construction Updates. The inside is just as beautiful as what’s outside … beauty throughout! Countertops installed in Angelfish B-14 Flooring installed in B-14 Angelfish Wet Bar and cabinets installed for Angelfish B-14 Installed the flooring in CV-4 Marlin Starting to install kitchen cabinets in C-7 Albacore II Installing shiplap […]

Read More

Kingfish Bay’s SPORTS COURT and PICNIC AREA

July 3, 2018

Kingfish Bay’s SPORTS COURT and PICNIC AREA are wonderful additions to the community. The perfect spot to gather with family and friends for a “Picnic in the Park” and a good old game of Corn Hole. Enjoy fun and games in the Great Outdoors at Kingfish Bay!      

Read More

Kingfish Bay’s NATURE PAVILION is stunning!

July 3, 2018

What a wonderful space for lounging and socializing in a beautiful and natural setting overlooking the scenic woodlands & wetlands. A great meeting spot for residents in the trellised areas with shade and cover or by the fire pits for warmth and evening ambiance. What a special community!

Read More

Weekly Update: June 28, 2018

June 28, 2018

Check out June 28th’s Kingfish Bay Construction Updates. Beautiful progress! Sod has been added to B-11 Angelfish Backsplash in the kitchen is installed for CV-4 Marlin Cabinets and lighting are installed for C-9 Bonita Shutters are painted and installed, door is painted for C-4 Albacore II The exterior is completely painted for C-7 Albacore II […]

Read More

Weekly Update: June 26, 2018

June 27, 2018

Check out June 26th’s Kingfish Bay Construction Updates. Come enjoy the “kick back” Caribbean vibe of Kingfish Bay. Completely installed Cabinets in B-14 Angelfish Framed shower seat in B-14 Angelfish Installed lighting fixtures in B-11 Angelfish Starting to layout plants for the landscape around B-11 Angelfish Screened in the top porch of B-11 Angelfish Painted […]

Read More

Weekly Update: June 21, 2018

June 21, 2018

Check out June 21st’s Kingfish Bay Construction Updates. We’re building you a beautiful home … in a breathtaking community! Installing cabinets in B-14 Angelfish Installed stone around the fireplace in B-11 Angelfish House wrap and roof felt is on B-17 Angelfish Starting to install the tile in the shower of CV-4 Marlin Put sod down […]

Read More

RIBBON CUTTING & Official GRAND OPENING Album

June 20, 2018

The Brunswick County Chamber of Commerce ceremonialRIBBON CUTTING & Official GRAND OPENINGof the CLUBHOUSE, BATH… Posted by Kingfish Bay Development on Wednesday, June 20, 2018

Read More

Weekly Update: June 19, 2018

June 19, 2018

Check out June 19th’s Kingfish Bay Construction Updates. Ready to move in? Fireplace is in B-11 Angelfish and ready to have the stone installed Installed roof trusses on B-17 Angelfish Installed countertops in the kitchen and bathroom in C-3 Bonita Installed shower door in C-3 Bonita In the process of staining the steps in C-3 […]

Read More

Weekly Update: June 14, 2018

June 14, 2018

Check out June 14th’s Kingfish Bay Construction Updates. We’re on a roll! Plumbing fixtures set in B-11 Angelfish Interior painted in B-11 Angelfish Framing and sheathing B-17 Angelfish Countertops installed in CV-4 Marlin Cabinets installed in CV-7 Tarpon Appliances and countertops are in C-4 Albacore II Adding the landscape to the front of C-4 Albacore […]

Read More

Weekly Update: June 12, 2018

June 14, 2018

Check out June 12th’s Kingfish Bay Construction Updates. Lookin’ good! Flooring has been installed in B-13 Angelfish Plumbing fixtures are set in B-13 Angelfish Appliances and countertops are in B-13 Angelfish Mantel has been built and installed in B-11 Angelfish for the fireplace Flooring is installed in B-11 Angelfish Countertops are installed in B-11 Angelfish […]

Read More

Weekly Update: June 7, 2018

June 14, 2018

Check out June 7th’s Kingfish Bay Construction Updates! Some final touches! Landscaping and sod is complete for C-3 Bonita CV-4 Marlin landscaping is complete Building a screened in porch for C-4 Albacore Siding almost completely installed in C-7 Albacore II Furniture has been added to the nature pavilion Putting green is complete Installing railroad ties […]

Read More

Weekly Update: June 5, 2018

June 5, 2018

Check out June 5th’s Kingfish Bay Construction Updates! The beauty of nature surrounds! Placed sod around Angelfish B-12, B-13, and B-14 Installing shutters or Angelfish B-14, B-13, and B-11 Painted exterior of Angelfish B-11 Prepping for tile installation in bathroom of Angelfish B-11 Applied first coat of interior paint for Angelfish B-11 Installed cabinets in […]

Read More

Weekly Update: May 31, 2018

May 31, 2018

Check out May 31st’s Kingfish Bay Construction Updates! Are you watching the beautiful progress? Exciting times! Framing B-17 Angelfish Installed cabinets and tile in B-11 Angelfish Installed flooring in C-3 Bonita Completed installation of the pavers in the courtyard of CV-1 Tarpon Installed cabinets in C-4 Albacore II Framed the fireplace in C-7 Albacore II […]

Read More

Weekly Update: May 29, 2018

May 29, 2018

Check out May 29th’s Kingfish Bay Construction Updates! Breathtaking! Tile is installed in the bathrooms in B-13 Angelfish Framing the Nature Pavilion Insulated the stairs and starting trim work in C-4 Albacore II              

Read More

Weekly Update: May 24, 2018

May 24, 2018

Check out May 24th’s Kingfish Bay Construction Updates! Come “Live the Dream!” Starting to install trim in B-11 Angelfish Beginning to install tile in the bathrooms of B-11 Angelfish Finishing the landscaping around B-14, B-13, and B-12 Angelfish Framing and sheathing B-17 Angelfish Added landscaping to the backyard of the Bonita C-3 Fireplace is set […]

Read More

Weekly Update: May 22, 2018

May 22, 2018

Check out May 22nd’s Kingfish Bay Construction Updates! Getting your Dream Home all ready for you! Landscaping has been added around B-12 Angelfish Starting to frame B-17 Angelfish Poured concrete for the walkways between the Angelfish Bungalows Tiled bathrooms in C-3 Bonita Installed cabinets in C-3 Bonita Cabinets and countertops are installed in CV-1 Tarpon […]

Read More

Sunset Beach Clubhouse Update: May 17, 2018

May 17, 2018

Kingfish Bay residents will have their own private sandbox! This beautifully designed, multi-level private clubhouse is located only 5.6 miles (or a 10-minute trolley ride) from Kingfish Bay at Sunset Beach. This beachfront property allows residents to experience the inviting waters and white sand shoreline of the Atlantic Ocean, along with the convenience of bath houses […]

Read More

Weekly Update: May 17, 2018

May 17, 2018

Check out May 17th’s Kingfish Bay Construction Updates! Wonderful things are happening! Tile is installed in the bathrooms of B-12 Angelfish Backsplash is installed in the kitchen of B-12 Angelfish Mudded the sheetrock in B-11 Angelfish Sidewalk framed and prepped for concrete between the Angelfish Bungalows Flooring completely installed in C-6 Albacore Driveway is framed […]

Read More

Weekly Update: May 15, 2018

May 15, 2018

Check out May 15th’s Kingfish Bay Construction Updates! Lookin’ good … naturally! • Countertops are installed in B-12 Angelfish • Drywall has been installed in B-11 Angelfish • Painted the side shutters to match the front door colors for Angelfish’s B-14, B-13, and B-12 • Installing tile in CV-1 Tarpon • Landscaping and fencing have […]

Read More

Weekly Update: May 10, 2018

May 10, 2018

Check out May 10th’s Kingfish Bay Construction Updates! The colorful Caribbean feel of Kingfish Bay. Front doors painted on B-14, B-13, B-12 (All Angelfish) Interior and exterior lighting installed in B-12 Angelfish Beginning to tile B-12 bathrooms Installing fence around CV-1 Tarpon Installed flooring in CV-3 Marlin Installed pavers around the pool on C-11 Cobia […]

Read More

Weekly Update: May 8, 2018

May 8, 2018

Check out May 8th’s Kingfish Bay Construction Updates! The Carolina’s newest Coastal Community … in America’s Best Little Small Town … Calabash, NC Siding, roofing, insulation, rough plumbing, rough mechanical all installed and complete for B-11 Angelfish Cabinets installed, master shower prepped and ready for tile in B-12 Angelfish Sidewalks poured for B-11, B-12, B-13 […]

Read More

Weekly Update: May 3, 2018

May 3, 2018

Check out May 3rd’s Kingfish Bay Construction Updates! The breathtaking views and natural setting is just the beginning of the journey! • Fencing has been completely installed for CV-5 Tarpon • Fencing around the courtyard has been installed for CV-4 Marlin • Exterior painting of C-9 Bonita is almost finished • Framing for the driveway […]

Read More

Weekly Update: May 1, 2018

May 1, 2018

Check out May 1st’s Kingfish Bay Construction Updates! Beautiful “works of art” in progress! Started to grade around Angelfish Bungalows Rough electric in B-11 Angelfish Almost complete with the fence around the pool for CV-5 Tarpon Adding river rock and landscaping for CV-5 Tarpon and pool is filled Putting sod down on the side of […]

Read More

Weekly Update: April 26, 2018

April 26, 2018

Check out April 26th’s Kingfish Bay Construction Updates! Come Live Relaxed … in this private slice of paradise! Rough mechanical, electrical, plumbing is installed for B-11 Angelfish Final electric is complete and power is on B-13 Angelfish First coat of interior paint is complete for B-14 Angelfish Sod and landscaping has been added to the […]

Read More

Weekly Update: April 24, 2018

April 24, 2018

Check out April 24th’s Kingfish Bay Construction Updates! Beauty, from the inside out! In the process of installing siding on Angelfish B-11. Roof felt is on B-11 Angelfish Under slab plumbing for B-17 Angelfish Blinds are installed in CV-5 Tarpon Appliances are in CV-5 Tarpon CV-5 Tarpon pool has pavers and they are working on […]

Read More

Weekly Update: April 19, 2018

April 19, 2018

Check out April 19th’s Kingfish Bay Construction Updates! It’s a Masterpiece in the making! Installing the siding on B-11 Angelfish B-17 Angelfish foundation is framed Adding plants to the CV-5 Tarpon landscape Framed driveway for CV-4 Marlin and ready for concrete to be poured B-1 Seahorse foundation is framed and under slab plumbing is complete […]

Read More

Weekly Update: April 17, 2018

April 17, 2018

Check out April 17th’s Kingfish Bay Construction Updates! A Caribbean Resort Village in Calabash, North Carolina … BEAUTIFUL! House wrap and windows installed for B-11 Angelfish Plumbing fixtures installed in CV-5 Tarpon Gutters are being installed on CV-7 Tarpon Front door painted on CV-1 Tarpon First coat of interior paint C-9 Bonita Pavers around the […]

Read More

Weekly Update: April 12, 2018

April 12, 2018

Check out April 12th’s Kingfish Bay Construction Updates! Homes that  shine from the inside out … and the outside in! Backsplash CV-5 Tarpon Kitchen Barn Doors in CV-5 Tarpon Cabinets and Countertops installed in Guest Suite of CV-5 Tarpon Plumbing for the pool in CV-5 Tarpon Added more tile to the CV-5 Tarpon pool Painted […]

Read More

Weekly Update: April 10, 2018

April 10, 2018

Check out April 10th’s Kingfish Bay Construction Updates! Homes that  enhance a natural living experience! Starting to frame second floor covered Loggia on Angelfish B-11 Sanding drywall to prepare for interior paint on Angelfish B-12 and Bonita C-9 Flooring has been installed for CV-5 Tarpon Countertops have been installed in Kitchen and Bathrooms for CV-5 […]

Read More

Weekly Update: April 5, 2018

April 5, 2018

Check out April 5th’s Kingfish Bay Construction Updates! We’re building DREAM HOMES! Added roof trusses to B-11 Angelfish Painting the interior of CV-4 Marlin Adding and painting trim the exterior of CV-9 Tarpon Flooring is completely installed in C-10 Albacore Exterior of C-6 Albacore has been painted Shingles have been installed on C-4 Albacore II […]

Read More

Weekly Update: April 3, 2018

April 3, 2018

Check out April 3rd’s Kingfish Bay Construction Updates! We’re SPRINGING forward! Framing second floor and sheathing B-11 Angelfish Mudded Angelfish B-12 Final Electric, Cabinets installed, and master bath shower tile & door installed for CV-5 Tarpon Cement has been poured for pool CV-5 Tarpon Finished exterior painting for CV-7 and CV-9 Tarpon Completing trim work […]

Read More

Weekly Update: March 29, 2018

March 29, 2018

Check out March 29th’s Kingfish Bay Construction Updates! Get ready to Live Relaxed. Starting to frame B-11 Angelfish Installing drywall in B-12 Angelfish Painting the exterior of CV-7 Tarpon Painting exterior of CV-9 Tarpon The pool is completely framed for CV-5 Tarpon First coat of interior paint is complete for CV-1 Tarpon Appliances are installed […]

Read More

Weekly Update: March 27, 2018

March 27, 2018

Check out March 27th’s Kingfish Bay Construction Updates! Making great progress! Painting interior accent wall color in CV-4 Marlin Digging and framing for the pool for CV-5 Tarpon Building a screened-in porch for C-10 Albacore C-7 Albacore II is ready for slab to be poured Windows are installed and house wrap is on C-4 Albacore […]

Read More

Sunset Beach Clubhouse Update: March 22, 2018

March 22, 2018

Thursday, March 22, 2018 PRIVATE SUNSET BEACH CLUBHOUSE Update from #kingfishbay • Update … Lookin’ good!               

Read More

Weekly Update: March 22, 2018

March 22, 2018

Check out March 22nd’s Kingfish Bay Construction Updates! Some “Finishing Up” and beautiful “New Beginnings” at Kingfish Bay! Pool is formed for C-3 Bonita Drywall has been installed in C-3 Bonita C-4 Albacore II is under roof Drywall has been installed in C-6 Albacore Tile is installed in the bathrooms of C-10 Albacore Landscaping around […]

Read More

Weekly Update: March 20, 2018 – Happy Spring Equinox!

March 20, 2018

Check out March 20th’s Kingfish Bay Construction Updates! Homes are springing up everywhere at Kingfish Bay! Happy Spring Equinox! Insulation installed in Angelfish B-12 C-8 Albacore has been sold and closed. Second floor roof trusses set on C-4 Albacore II Sheathing is being installed on C-4 Albacore II C-7 Albacore II foundation is framed waiting […]

Read More

Weekly Update: March 15, 2018

March 15, 2018

Check out March 15th’s Kingfish Bay Construction Updates! We’re sprouting and blooming! Landscaping added around the Clubhouse and model homes Both Marlin Exteriors (CV-10 & CV-3) have been painted Concrete has been poured for entrance/walkways for CV-4 Marlin, CV-5 Tarpon, and B-15 Angelfish Setting roof trusses for C-4 C-2 Albacore is complete and has been sold/closed […]

Read More

Sunset Beach Clubhouse Update: March 15, 2018

March 15, 2018

Thursday, March 15, 2018 PRIVATE SUNSET BEACH CLUBHOUSE Update from #kingfishbay • Update … WOW! NICE!              

Read More

Weekly Update: March 14, 2018

March 14, 2018

Check out March 14th’s Kingfish Bay Construction Updates! Beautiful things are “Springing” up all over Kingfish Bay! • Sidewalk poured in front of the Angelfish Bungalows • Walkway/Entrance framed and ready for concrete at the Angelfish B-15 • Slab has been poured on Angelfish B-11 • Exterior of CV-4 Marlin is painted. The front entrance/walkway […]

Read More

Kingfish Bay Home Exteriors PART VI

March 8, 2018

Kingfish Bay offers various Courtyard and Lagoon Style Pool Designs, as well as Hardscapes, that beautifully accentuate and compliment the stunning natural beauty that surrounds.  

Read More

Kingfish Bay Home Exteriors PART V

March 7, 2018

Palms symbolize the tropics and vacations, so they appropriately bring that tropical, resort-style look and feel to the “Live Relaxed” vibe of Kingfish Bay.  

Read More

Kingfish Bay Home Exteriors PART IV

March 6, 2018

True to Caribbean style, the use of both Louvered and Bahama Shutters is an elegant way to block intense UV rays … and add a unique and beautiful accent to Kingfish Bay homes.  

Read More

Kingfish Bay Home Exteriors PART III

February 28, 2018

The Insulated Fiberglass Front Entrance Door and Insulated Vinyl-clad Windows used on Kingfish Bay homes are low maintenance and energy efficient.      

Read More

The EXCITEMENT is BUILDING!

February 27, 2018

Progress on the Kingfish Bay Sunset Beach Oceanfront Clubhouse! THE EXCITEMENT IS BUILDING! *snicker*                                                                                                        […]

Read More

Weekly Update: February 15, 2018

February 20, 2018

Check out February 15th’s Kingfish Bay Construction Updates! This Gated Waterfront Community is sure shaping up! Accent tabby finish is complete on the Marlins CV-4, CV-3, and CV-10 Painting of the interior for CV-3 Marlin is complete Shutters installed on CV-7 Tarpon and CV-9 Tarpon Gutters installed on CV-5 Tarpon Sheetrock is being installed on […]

Read More

Progress on the Kingfish Bay Sunset Beach Oceanfront Clubhouse!

February 15, 2018

Framing has begun!                                              

Read More

Weekly Update: February 13, 2018

February 13, 2018

Check out February 13th’s Kingfish Bay Construction Updates! Going at it from all angles to create a “Live Relaxed” Community for you! Sheetrock installed CV-4 Marlin Sheetrock is being delivered for CV-10 Marlin Painting the interior and fiber cement board has been applied to the front exterior accent columns on CV-3 Marlin Insulation is going in […]

Read More

Kingfish Bay Home Exteriors PART II

February 7, 2018

The Dimensional Architectural Roofing Shingles used on Kingfish Bay homes create an impressive and dramatic appearance … while providing superior weather protection!

Read More

Weekly Update: February 6, 2018

February 6, 2018

Check out February 6th’s Kingfish Bay Construction Updates! Beautiful things are happening at “The Carolina’s Newest Coastal Community.” House wrap is on and windows are installed B-12 Angelfish Exterior painting and trim is complete on CV-5 Tarpon Flooring in the great room and kitchen has been installed C-11 Cobia Plumbing fixtures in the kitchen of C-11 […]

Read More

Weekly Update: February 1, 2018

February 1, 2018

Check out February 1st’s Kingfish Bay Construction Updates! Overlooking the Calabash River, this Gated Waterfront Community is A SIGHT TO BEHOLD! B-12 Angelfish is under roof Insulating CV-4 Marlin and CV-9 Tarpon Completing trim work and exterior painting on CV-5 Tarpon Installing HVAC system in CV-1 Tarpon Master bathroom and closet is tiled in C-11 […]

Read More

Kingfish Bay Home Exteriors PART I

January 31, 2018

Kingfish Bay homes are built to stand up to the elements … while looking incredible!

Read More

Weekly Update: January 30, 2018

January 30, 2018

Check out January 30th’s Kingfish Bay Construction Updates! Carolina’s Newest Coastal Community is shaping up nicely! Roof trusses are set for Angelfish B-12 More exterior paint has been added to CV-5 Tarpon Shower has been tiled in CV-5 Tarpon Graded for the road behind the courtyard villas Pouring concrete for the curbs behind the courtyard […]

Read More

Weekly Update: January 25, 2018

January 30, 2018

Check out January 25th’s Kingfish Bay Construction Updates! Things are rapidly progressing in “The Carolina’s Newest Coastal Community.” 1. Exterior lighting has been added to Albacore’s C-2 and C-8 2. Starting construction on the pool for C-2 Albacore 3. Framing & Sheathing the 2nd Story of Angelfish B-12 4. Painting is still in progress for […]

Read More

Weekly Update: January 23, 2018

January 30, 2018

Check out January 23rd’s Kingfish Bay Construction Updates! The Carolina’s Newest Coastal Community – in America’s BEST Little Small Town, Calabash, NC. 1. Shingles are installed on C-6 Albacore 2. Framing and sheathing B-12 Angelfish 3. Starting to paint exterior of CV-5 Tarpon 4. Siding, Windows and doors are installed on CV-10 Marlin 5. Poured […]

Read More

Weekly Update: January 17, 2018

January 17, 2018

Check out today’s Kingfish Bay Construction Updates! Welcome to America’s Best Little Small Town, Calabash, North Carolina. 1. Windows are installed on C-6 Albacore 2. Electrical finish work on C-2 Albacore and C-11 Cobia 3. Underground power for CV-1 Tarpon and CV-5 Tarpon 4. Tile is being installed in CV-5 Tarpon 5. Deck and stairs […]

Read More

Weekly Update: January 11, 2018

January 11, 2018

Check out today’s Kingfish Bay Construction Updates! The Carolina’s Newest Coastal Community – LIVE RELAXED. 1. Painting exterior of C-8 Albacore 2. First coat of paint has been applied to the interior of C-10 Albacore 3. Siding is almost completely installed on Angelfish B-13 4. Starting to paint the first coat on the interior of […]

Read More

Weekly Update: December 30, 2017

December 30, 2017

We are excited to announce that the sidewalks have been poured around the Clubhouse and in front of the Bungalow!

Read More

Weekly Update: December 20, 2017

December 20, 2017

Santa’s Elves are hard at work at Kingfish Bay! How’s it looking? Give us a call today to schedule a tour!

Read More

Myrtle Beach & Beaufort Named to Coastal Living’s “Best Beach Towns for Christmas”!

December 11, 2017

Exciting news for everyone that loves Christmas! This month Coastal Living Magazine selected Myrtle Beach, SC and Beaufort, NC as two of it’s “TOP 10 Best Beach Towns for Christmas”! Ho! Ho! HO! Beaufort, North Carolina Being this far south means that you can still get out on the water in kayaks without your Nanook […]

Read More

Bath House Updates and More!

December 1, 2017

The centerpiece of Relaxed Living at Kingfish Bay can be found in the luxurious, on-site Community Center, which offers residents a wide variety of social and leisure activities, amenities and services that all add to an exceptional quality of life.

Read More

Weekly Update: October 26, 2017

October 26, 2017

Nothing but blue skies and building supplies!

Read More

Weekly Update: October 20, 2017

October 20, 2017

Another gorgeous day at Kingfish Bay! Check out what’s happening around our development ?  

Read More

Weekly Update: October 15, 2017

October 15, 2017

It’s Thursday….which means Friday is right around the corner! Take a look at what we accomplished this week. ?

Read More

Weekly Update: October 13, 2017

October 13, 2017

Tuesday Newsday! There’s so much going on here at Kingfish Bay!?  

Read More

Weekly Update: October 7, 2017

October 7, 2017

Happy FriYAY! ! There’s been a lot of exciting progress happening around our development. We are going vertical on 4 new houses, 4 other houses are under roof and in various stages, infrastructure is underway around the Bungalow area, and the community pool had concrete poured yesterday!

Read More

Weekly Updates: September 21, 2017

September 17, 2017

– Foundation framed for C-3 and CV-9 – House wrapped on C-11 – Working on the second floor framing for CV-3 – New palm trees in front of the Angelfish model – Starting to paint the exterior of the Bath House  

Read More

Weekly Update: September 14, 2017

September 14, 2017

Happy almost Friday! Weekly updates are below: 1. Run electric to the front entrance landscaping and decorative walls for lighting 2. The ceiling is going up in the Bath House 3. Cobia C-11 is under roof 4. Framers are working on the Marlin CV-3 5. Plumbers are starting the under slab plumbing on CV-5 6. […]

Read More

Weekly Updates: September 12, 2017

September 12, 2017

Good afternoon everyone! Please see below for our weekly updates. ? 1) Insulation has been installed in the Bath House 2) Siding is complete on the Bath House 3) Doors have been put on the Bath House 4) Some of the furniture has been delivered and is being staged in the Clubhouse 5) Paint touch-ups […]

Read More

Weekly Update: September 7, 2017

September 7, 2017

Good afternoon everyone! Here are your updates for today: – Final Plumbing is complete for the Clubhouse – Some of the exercise equipment has been delivered for the fitness room in the Clubhouse – Grading has been completed to start the foundation framing on Lot CV-5 – Framers are still working on C-11 – Rough-in […]

Read More

Weekly Updates: September 1, 2017

September 1, 2017

It’s FriYAY! What are your plans this Labor Day Weekend? Comment below and let us know! Updates today at KFB: 1. Lot CV-3 is ready to have concrete slab poured tomorrow morning 2. Foundation is being framed for Lot C-2 3. Leveling of the dirt getting ready to dig footers on Lot C-10 4. New […]

Read More

Weekly Updates: August 30, 2017

August 30, 2017

Good afternoon! We’ve got more updates than usual today! Isn’t it exciting? See below for the news: – Installing partitions, paper towel dispensers, and toilet paper dispensers in the restrooms at the Clubhouse – Appliances are starting to be installed in the kitchen of the Clubhouse – Cobia has been filled with water and palm […]

Read More

Weekly Updates: August 24, 2017

August 24, 2017

It’s almost Friday! Look below for some exciting updates on the Clubhouse! ? 1. Metal Roof is complete on the Bath House 2. Partitions are going in the bathrooms in the Clubhouse 3. Rubber flooring is being installed in the Fitness Room of the Clubhouse 4. Flooring has been installed in the hallway and offices of […]

Read More

Weekly Update: August 22, 2017

August 22, 2017

Did you watch the solar eclipse yesterday? It was a sight to see wasn’t it? You know what else is a sight to see? The Cobia here at Kingfish Bay! Updates are listed below: – The Cobia pool is plastered and the pavers are down. – Fence is going up around the pool at the […]

Read More

Weekly Update: August 16, 2017

August 16, 2017

Summer’s almost over… but construction on the Courtyard Villas has just begun! Check out more updates below: – Building has begun on CV-3 – Building has begun on C-11 – Sod has been added to the side of the Marlin – Countertops are being installed in the Clubhouse – The Cobia pool is getting tiled […]

Read More

Weekly Update: August 3, 2017

August 3, 2017

Friday is almost here! Hope everyone’s been having a wonderful week so far! Here are a couple updates at Kingfish Bay: – The Cobia front door and shutters have been painted and installed – Construction for the pool at the Cobia has begun  

Read More

Weekly Update: August 1, 2017

August 1, 2017

Check out what’s happening this week at Kingfish Bay below! We’ve got lots of exciting news and photos coming your way. – Accent painting is being completed in the clubhouse – Cabinets are installed in the Clubhouse – One retainer wall is complete – Work has begun on the second retainer wall       […]

Read More

Weekly Update: July 27, 2017

July 27, 2017

Good morning everyone! Here’s what’s new at Kingfish Bay this week: – We are progressing with the framing of the Bath House – Retaining wall for the pool – Painting the interior of the clubhouse – Installing irrigation at the front entrance And… – The driveway is completed for the Marlin!! #success Check back next […]

Read More

Weekly Updates: July 19, 2017

July 19, 2017

Happy Wednesday! Here are a few updates from this week: 1) Roof framing has begun on the Bath House 2) Interior Clubhouse painting is underway 3) Concrete is being poured for the Marlin driveway and walkway to the pool area 4) Ceramic tile back splash is going up in the Angelfish

Read More

Weekly Update: June 20, 2017

June 20, 2017

Good afternoon! We hope everyone is having a wonderful week! ?Here are a few construction updates for today: – Interior trim being completed on the Clubhouse – Grading for the Cottage Lots – More progress with the exterior paint on the Clubhouse – Loggers are finishing up at Sunset Pointe in Phase 2

Read More

Weekly Update: June 14, 2017

June 14, 2017

Things are moving at Kingfish Bay! Below are a few of the most recent additions we’ve been working on: – electrical and under slab plumbing for the Bath House – putting sheetrock up in the Clubhouse – painting the exterior of the Clubhouse – removing trees and grading Courtyard lots – planting trees at the […]

Read More

Weekly Update: June 7, 2017

June 7, 2017

Weekly updates. Landscaping/pool for the Courtyard of the “Marlin” Model 

Read More