Check out August 6th’s Kingfish Bay Construction Updates.

Kingfish Bay is located within walking distance of downtown Calabash and allows direct access to the Intracoastal Waterway via the Calabash River.

  • More landscaping added C-14 Albacore II
  • Interior light fixtures C-55 Albacore II
  • Countertops and glass cabinet doors installed C-55 Albacore II
  • Caulking exterior prepping to paint CV-8 Longfin
  • Cabinets installed CV-14 Longfin
  • Sheetrock up and prepped for primer CV-18 Longfin
  • Siding C-13 Anchor Coral II
  • Shot concrete for the pool C-41 Anchor Coral II
  • Cable railing C-41 Anchor Coral II
  • Roofing B-25 Angelfish
  • Windows set B-31 Seahorse
  • Slab poured and ready for framing SF-27 Amberjack