Check out June 12th’s Kingfish Bay Construction Updates.

Lookin’ good!

  • Flooring has been installed in B-13 Angelfish
  • Plumbing fixtures are set in B-13 Angelfish
  • Appliances and countertops are in B-13 Angelfish
  • Mantel has been built and installed in B-11 Angelfish for the fireplace
  • Flooring is installed in B-11 Angelfish
  • Countertops are installed in B-11 Angelfish
  • Starting to frame and sheath the second floor of Angelfish B-17
  • Painting the interior of C-4 Albacore II
  • Starting to install the light fixtures in C-4 Albacore II
  • Installed insulation in C-7 Albacore II
  • Installing the siding on B-1 Seahorse